Expanding projects are operational and have a further phase announced or under way on the same site.
ArusGrid records 48 projects operational and expanding, with 4,234 MW of planned IT load, led by Indonesia (13 projects, 1,732 MW), Malaysia (14 projects, 1,609 MW) and India (8 projects, 633 MW). Disclosed running capacity across them is 843 MW. The largest is DCI H2 Campus (H2-01, H2-02), Karawang at 600 MW in Greater Jakarta. The operators with the most capacity at this stage are DCI Indonesia (900 MW), YTL (500 MW), Vantage Data Centers (300 MW), K2 (Kuok) (234 MW) and EdgeConneX (200 MW).
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| DCI H2 Campus (H2-01, H2-02), Karawang | Karawang | Expanding | 600 | 27 | DCI Indonesia | Likely |
| DCI H1 Campus (JK1 to JK6), Cibitung | Cibitung, Bekasi | Expanding | 300 | 75 | DCI Indonesia | Confirmed |
| EdgeConneX Jakarta campus (JKT01+), Cikarang | Cikarang, Bekasi | Expanding | 200 | 8 | EdgeConneX | Likely |
| BW Digital NDP1 | Batam | Expanding | 120 | 24 | BW Digital | Confirmed |
| BDx CGK4 AI Campus, Jatiluhur | Jatiluhur, Purwakarta | Expanding | 120 | undisclosed | BDx Indonesia | Confirmed |
| NeutraDC Hyperscale DC Cikarang (HDC Cikarang) | Cikarang, Bekasi | Expanding | 120 | undisclosed | NeutraDC (Telkom Data Ekosistem) | Likely |
| DayOne Nongsa Digital Park Campus (NDP1-3) | Batam | Expanding | 72 | 34 | DayOne (PT Digitalland Service One) | Likely |
| IndoKeppel Data Centre 1 (IKDC1), Bogor | Citeureup, Bogor Regency | Expanding | 50 | undisclosed | IndoKeppel (Keppel Data Centres x Salim Group) | No signal either way |
| Microsoft JKT09 / JKT02 (KIIC Karawang campus) | Karawang (Karawang International Industrial City) | Expanding | 48 * | undisclosed | Microsoft | Confirmed |
| NTT Jakarta 3 (JK3), Bekasi | Bekasi | Expanding | 45 | 15 | NTT DATA / NTT Global Data Centers | Unlikely |
| Digital Realty Bersama CGK11, Central Jakarta | Jakarta | Expanding | 32 | 5 | Digital Realty Bersama (BDDC) | No signal either way |
| Golden Digital Gateway (Nongsa One) | Batam | Expanding | 25 | 5.2 | Golden Digital Gateway (Data Center First) | No signal either way |
| Microsoft Indonesia Central data center (Jawa Barat) | Cikarang, Bekasi | Expanding | none published | undisclosed | Microsoft | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| YTL Green Data Center Park | Kulai | Expanding | 500 | 150 | YTL Power (YTL Data Center Holdings) | Confirmed |
| Vantage JHB1 (ex-Yondr) | Sedenak (Kulai) | Expanding | 300 | 25 | Vantage Data Centers (acquired from Yondr Group) | Confirmed |
| K2 JHR1 Campus | Sedenak (Kulai) | Expanding | 234 | 40 | K2 Strategic (Kuok Group) | Likely |
| AirTrunk JHB1 | Iskandar Puteri | Expanding | 150 | 50 | AirTrunk | Confirmed |
| Princeton Digital Group JH1 | Sedenak (Kulai) | Expanding | 150 | 52 | Princeton Digital Group | Confirmed |
| Bridge Data Centres MY01/MY02 | Cyberjaya | Expanding | 107 | 20 | Bridge Data Centres (Chindata) | Unlikely |
| BrightRay Sedenak Campus (MY-01/02/03) | Sedenak (Kulai) | Expanding | 90 | undisclosed | BrightRay (Shanghai DC-Science) | No signal either way |
| NEXTDC KL1 | Petaling Jaya | Expanding | 65 | 15 | NEXTDC | Likely |
| Equinix JH1 + JH2 | Iskandar Puteri | Expanding | 13 | 6 | Equinix | Confirmed |
| DayOne Kempas Tech Park Campus | Johor Bahru (Kempas) | Expanding | none published | undisclosed | DayOne (ex-GDS International) | Confirmed |
| DayOne Nusajaya Tech Park Campus | Iskandar Puteri | Expanding | none published | undisclosed | DayOne (ex-GDS International) | Confirmed |
| AIMS Cyberjaya (Blocks 1-3) | Cyberjaya | Expanding | none published | undisclosed | AIMS Data Centre (TIME dotCom) | No signal either way |
| AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley) | Cyberjaya / Bukit Jalil (TPM) | Expanding | none published | undisclosed | Amazon Web Services | Likely |
| Bridge Data Centres MY03 | Bukit Jalil | Expanding | none published | 16 | Bridge Data Centres (Chindata) | No signal either way |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| PDG MU1 campus | Navi Mumbai | Expanding | 150 | 50 | Princeton Digital Group | Likely |
| Digital Edge BOM1 campus | Navi Mumbai | Expanding | 120 | undisclosed | Digital Edge DC | Likely |
| NTT Navi Mumbai 1 (NAV1) campus | Navi Mumbai | Expanding | 100 | 30 | NTT Global Data Centers | No signal either way |
| CapitaLand Data Centre Navi Mumbai | Navi Mumbai | Expanding | 71 | 34 | CapitaLand India | No signal either way |
| STT Chennai Ambattur campus (Chennai 2, 3 and 4) | Chennai | Expanding | 58 | 40 | STT GDC India | Likely |
| Anant Raj Cloud Manesar | Manesar | Expanding | 50 | 21 | Anant Raj Cloud | Likely |
| Sify Rabale campus | Navi Mumbai | Expanding | 43 | undisclosed | Sify Infinit Spaces | Likely |
| AdaniConneX Noida | Noida | Expanding | 40 | 10 | AdaniConneX | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Gulf Data Hub Abu Dhabi (ICAD) | Abu Dhabi | Expanding | 64 | 16 | Gulf Data Hub | No signal either way |
| Khazna AUH6 (with AUH8 extension) | Masdar City | Expanding | 62 | 32 | Khazna Data Centers | Likely |
| Pure DC AUH01 (Yas Island) | Yas Island | Expanding | 48 | 20 | Pure Data Centres Group | Likely |
| Gulf Data Hub Dubai Silicon Oasis campus | Dubai Silicon Oasis | Expanding | none published | undisclosed | Gulf Data Hub | No signal either way |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| True IDC North Muangthong | Pak Kret | Expanding | 40 | undisclosed | True Internet Data Center (True IDC) | No signal either way |
| Etix Bangkok Campus (BKK#1 + BKK#2) | Bangkok | Expanding | 28 | 5 | Etix Everywhere | Confirmed |
| True IDC East Bangna Campus | Bang Sao Thong / Bang Na | Expanding | none published | undisclosed | True Internet Data Center (True IDC) | Likely |
| ByteDance / TikTok Thailand data infrastructure | Bangkok / Samut Prakan / Chachoengsao (multi-site) | Expanding | none published | undisclosed | TikTok Pte Ltd (ByteDance) | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Meeza M-VAULT 1 to 5 (Doha portfolio) | Doha | Expanding | 18 | 18 | Meeza QSTP LLC | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| center3 Riyadh (Khurais) | Riyadh | Expanding | none published | undisclosed | center3 | No signal either way |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| AWS Singapore Region (multi-site self-build/lease) | Singapore | Expanding | none published | undisclosed | Amazon Web Services | Likely |
| Keppel Data Centre Campus (KDC SGP7/8/9) | Singapore | Expanding | none published | undisclosed | Keppel Data Centres | Confirmed |
| Microsoft Singapore (Woodlands campus) | Singapore | Expanding | none published | undisclosed | Microsoft | Likely |