ArusGridProject
Directory › China › Qingyang › China Energy Engineering Qingyang Big Data Center Industrial Park

China Energy Engineering Qingyang Big Data Center Industrial Park

Qingyang, Gansu, China · Qingyang market · location approximate to district level

Also listed as 中国能建庆阳大数据中心产业园(“东数西算”源网荷储一体化智慧零碳大数据产业园示范项目), 中国能建庆阳大数据中心, CEEC Qingyang A1 and 中能建庆阳.

China Energy Engineering Qingyang Big Data Center Industrial Park is a data center project in Qingyang, China, operated by China Energy Engineering (中国能源建设股份有限公司). It is operational and expanding. It is planned for 60 MW of IT load.

Latest change on record: moved to expanding in May 2026. Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
60 MW
Running now
Not disclosed
Operators rarely publish this
Operator
China Energy Engineering (中国能源建设股份有限公司)
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingyang holds 8 active projects with 395 MW of planned IT load between them, and China Energy Engineering Qingyang Big Data Center Industrial Park ranks third by planned capacity. Of those, 3 are operational and expanding, 4 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Qingyang, and ArusGrid does not estimate one.

It is the only China Energy Engineering project ArusGrid tracks. It sits on the CEEC Qingyang Big Data Center Industrial Park. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. A1 is operational with a 2024 target; A2 is operational with a 2026 target; A4 is under construction with a 2026 target. The dated record runs from under construction on 22 December 2023 to operational and expanding in May 2026. The money on record is CN¥5.5bn as of September 2026, the announced investment. Power comes from China Energy Engineering (self built) through a dedicated substation at 110 kV. Cooling uses evaporative cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 10 September 2026, and last checked the record on 17 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

The design specifies racks of up to 140kW, and A3 is being redesigned for full liquid cooling (company filing Sep 2026, Science and Technology Daily Jun 2026).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

A1 · OperationalSize not published, target 2024
A2 · OperationalSize not published, target 2026
A4 · Under constructionSize not published, target 2026
A3, redesigned for full liquid cooling · Under constructionSize not published, target 2027

Stage history

2023-12-22Under construction · thepaper.cn
2024-09Operational · pdf.dfcfw.com
2026-05Expanding · pdf.dfcfw.com

Who is behind it

OperatorChina Energy Engineering (中国能源建设股份有限公司) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-09CN¥5.5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中电工程广东院 · Jun 2026 Reported source ↗
General contractor (总承包) for the park. 中电工程 (中国电力工程顾问集团有限公司) invests, builds and operates it.
Grid and substation works中国能建广东院 (CEEC Guangdong Electric Power Design Institute) · Sep 2024 · completed Confirmed source ↗
EPC of the 110kV Nengjian No.1 substation
Land
Site73,337 sqm · Jun 2026 Reported source ↗
Total site area about 110 mu, converted at 666.7 sqm/mu. Counterparty not disclosed.
Site110 mu · Jun 2026 Reported source ↗
Total site about 110 mu, gross floor area about 88,000 sqm, four data centre buildings. Counterparty not disclosed.
Power supply
Dedicated substationChina Energy Engineering (self built) · 110kV · Sep 2024 Confirmed source ↗
110kV Nengjian No.1 substation completed and put into service on 4 Sep 2024. No MVA given. · Applies to the whole campus.
Renewable power dealProject's own 200MW new energy station · 200 MW · Sep 2024 Reported source ↗
Power is sold to the data centre under medium and long term market trades. · Applies to the whole campus.
Water and cooling
CoolingEvaporative cooling Reported source ↗
Indirect evaporative cooling used at scale for free cooling. A3 building is to use full liquid cooling (due end-June 2027).

Sources checked 2026-10-17

  1. 中国能源建设股份有限公司投资者关系活动记录 (中国能建, 2026-09-10)
  2. 中国能建庆阳大数据中心产业园A2楼点亮投运 (科技日报, 2026-06-11)
  3. 竞速数字经济新赛道 绘就“中国算谷”新蓝图——庆阳市加快建设“东数西算”国家数据中心集群 (澎湃号·政务, 2024-08-09)
  4. 中国能建拟定增募资150亿元 (中国证券报, 2023-02-16)

More in Qingyang

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.