Also listed as 中国联通庆阳智算中心 and 中国联通庆阳数据中心新建一期项目.
China Unicom Qingyang Intelligent Computing Center is a data center project in Qingyang, China, operated by China Unicom (中国联通). It is under construction. The operator has not published an IT load figure. It is planned for 8,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as under construction on 25 November 2024. Record last checked against its sources on 19 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Qingyang holds 8 active projects with 395 MW of planned IT load between them, and China Unicom Qingyang Intelligent Computing Center has no published figure so it sits outside that ranking. Of those, 3 are operational and expanding, 4 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Qingyang, and ArusGrid does not estimate one.
China Unicom has 9 others in China tracked by ArusGrid, including China Unicom Zhongwei Cloud Data Center, China Unicom (Huailai) Big Data Innovation Industrial Park (中国联通(怀来)大数据创新产业园) and China Unicom Southwest Data Center (Chongqing Shuitu). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1, two buildings, 110kV substation, about 60,000 P is under construction with a 2025 target; Phase 2, two further buildings is announced. The stage was recorded as under construction on 25 November 2024. The money on record is CN¥3.4bn as of June 2025, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 4 August 2026, and last checked the record on 19 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
The design serves 8 to 60kW intelligent computing racks, with centralized water cooling and pilot cold-plate and immersion liquid cooling. No deployment is confirmed yet.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.