Directory › China › Qingyang › Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地)

Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地)

Qingyang (East Data West Computing industrial park), Gansu, China · Qingyang market · location approximate to city level

Also listed as 秦淮数据庆阳 and Chindata Qingyang.

Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地) is a data center project in Qingyang (East Data West Computing industrial park), China, operated by Chindata Group (秦淮数据). It is under construction. The operator has not published an IT load figure. It is planned for 3,800 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 23 February 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Chindata Group (秦淮数据)
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingyang holds 8 active projects with 395 MW of planned IT load between them, and Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地) has no published figure so it sits outside that ranking. Of those, 3 are operational and expanding, 4 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Qingyang, and ArusGrid does not estimate one.

Chindata has 4 others in China tracked by ArusGrid, including Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地), Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目) and Chindata Jining Intelligent Computing Centre, Ulanqab (秦淮数据集宁智算中心). It sits on the Chindata Qingyang campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 23 February 2023. The money on record is CN¥770m as of March 2023, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 28 November 2024, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · Under constructionSize not published

Stage history

2023-02-23Under construction · donews.com

Who is behind it

OperatorChindata Group (秦淮数据) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2023-03CN¥770m

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Power allocation or planAug 2023 Reported source ↗
Designed for 100% zero-carbon operation, with renewable power supplied directly and consumed on site, backed by large-scale energy storage. · Design intent only. The planned 150MW is to be built in batches over 3 to 5 years and is not labelled IT load. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 【地方】甘肃庆阳实施“东数西算”工程调查 (经济日报 (via 人民论坛网), 2023-08-24)
  2. 创始人出局、公司调头,秦淮数据还能走多远? (DoNews, 2023-03-07)
  3. 甘肃40条措施推进“东数西算”,强调数据中心统筹布局和审查管理 (21世纪经济报道 / 南方财经网, 2022-09-23)
  4. 秦淮数据零碳数据中心产业基地项目建设如火如荼 (中国储能网, 2023-07-21)
  5. 【强信心 看发展】乘“数”而上兴新业――庆阳市聚力建设国家数据中心集群 (甘肃日报, 2024-11-28)

More in Qingyang

Also run by Chindata

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.