Directory › China › Huailai › Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地)

Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地) data center

Zhangjiakou, Hebei, China · Huailai market · location approximate to city level

Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地) is a data center project in Zhangjiakou, China, operated by Chindata Group (秦淮数据集团). It is operational and expanding. It is planned for 200 MW of IT load.

Latest change on record: moved to expanding on 9 April 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
200 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Chindata Group (秦淮数据集团)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Huailai holds 8 active projects with 1,294 MW of planned IT load between them, and Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地) ranks third by planned capacity. Of those, 2 are operational, 5 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Huailai, and ArusGrid does not estimate one.

Chindata has 4 others in China tracked by ArusGrid, including Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目), Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地) and Chindata Jining Intelligent Computing Centre, Ulanqab (秦淮数据集宁智算中心). It sits on the Chindata Huailai bases, Huailai County campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from operational on 1 January 2021 to operational and expanding on 9 April 2026. Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 2 public sources for this project, the latest dated 13 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

The Paper (Sep 2026) says Chindata's Huailai bases serve major clients' storage and AI computing business.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, over 200 MW IT operating and under construction · Expanding200 MW

Stage history

2021-01-01Operational · news.ifeng.com
2026-04-09Expanding · news.cn

Who is behind it

OperatorChindata Group (秦淮数据集团) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Chindata's waterless cooling (barely relies on evaporation) deployed at scale in Huailai, plus large-scale liquid cooling.

Sources checked 2026-10-19

  1. 河北张家口:算力和电力协同发展 (新华网, 2026-04-09)
  2. 探访河北怀来绿色算力集群:算力如何支撑日常数字生活 (澎湃新闻 (凤凰网转载), 2026-09-13)

More in Huailai

Also run by Chindata

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.