Hoyinn Data (Huailai) Technology Industrial Park (合盈数据(怀来)科技产业园)

Zhangjiakou, Hebei, China · Huailai market · location approximate to city level

Hoyinn Data (Huailai) Technology Industrial Park (合盈数据(怀来)科技产业园) is a data center project in Zhangjiakou, China, operated by Beijing Zhongke Hoyinn Data Technology (北京中科合盈数据科技有限公司). It is operational. It is planned for 700 MW of IT load. The operator reports 700 MW running.

Latest change on record: moved to operational on 1 December 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
700 MW
Running now
700 MW
Operators rarely publish this
Operator
Beijing Zhongke Hoyinn Data Technology (北京中科合盈数据科技有限公司)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Huailai holds 8 active projects with 1,294 MW of planned IT load between them, and Hoyinn Data (Huailai) Technology Industrial Park (合盈数据(怀来)科技产业园) ranks first by planned capacity. Of those, 2 are operational, 5 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Huailai, and ArusGrid does not estimate one.

It is the only Hoyinn project ArusGrid tracks. It sits on the Hoyinn Data Huailai Technology Industrial Park, Huailai County. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from under construction on 1 November 2022 to operational on 1 December 2025. The money on record is CN¥18bn as of August 2026, the published figure. Power comes from self-built through a dedicated substation (reported, unconfirmed). Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 13 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Xinhua calls the park one of the largest single AI computing clusters in North China (Apr 2026).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 700 MW IT in service · Operational700 MW, target 2025

Stage history

2022-11-01Under construction · news.bjd.com.cn
2025-12-01Operational · news.cn

Who is behind it

OperatorBeijing Zhongke Hoyinn Data Technology (北京中科合盈数据科技有限公司) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Figure, 2026-08CN¥18bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中国建筑第八工程局有限公司 (中建八局) · Jun 2022 Confirmed source ↗
Built phase 1: 4 data centre buildings, 2 operations buildings and 4 diesel generator buildings on two plots of 66,000 and 63,000 sqm. Topped out on 20 May (2022), 11 days early. Value not stated.
Civil and structural works中国建筑一局(集团)有限公司 (中建一局) · Jun 2024 Reported source ↗
Civil general contract for phase 3 stage 2: main structure, secondary structure, facade and roofing of 2 data centre buildings and 2 diesel generator buildings. Value not stated. May be one of the three 中建一局 projects already in notes.
Power supply
Dedicated substationself-built · Sep 2026 Reported source ↗
Source-grid-load-storage model matching green power to compute load. Some projects reach 100% green power (Xinhua 2026-04-09). · Substation voltage and capacity not stated. · Applies to the whole campus.
Power allocation or plan北京中科合盈数据科技有限公司 (own renewable plants) · Aug 2026 Reported source ↗
Hoyinn has built several renewable plants in Weixian, Guyuan and Zhangbei (Zhangjiakou) with 2.78 GW installed and grid-connected. Their full output could cover a year of the park's use. More than half of park power is green and some projects run on 100 percent green power. · The park is described as the largest source-grid-load-storage carbon-neutral demonstration around Beijing. Power is dispatched by the Jibei grid, and the data centres draw on energy storage when renewable output drops. 2.78 GW is generation capacity, not grid supply to the park. · Applies to the whole campus.
Water and cooling
WaterDual water plants serving the park Reported source ↗
CoolingHybrid air and liquid cooling Reported source ↗
Large-scale indirect evaporative cooling using outdoor air, running dry mode over 60% of the time, plus liquid cooling. Waste heat above 50C supplied to nearby schools and homes.

Sources checked 2026-10-19

  1. 河北张家口:算力和电力协同发展 (新华网, 2026-04-09)
  2. 牢记嘱托 感恩奋进·奋力谱写中国式现代化建设河北篇章|乘势而上 算力与产业双向赋能 (河北日报 (新浪财经转载), 2026-08-01)
  3. 环京首个零碳数据中心迎建设节点 (北京日报, 2023-02-03)
  4. 探访河北怀来绿色算力集群:算力如何支撑日常数字生活 (澎湃新闻 (凤凰网转载), 2026-09-13)
  5. 服务东数西算!中建八局承建的河北张家口合盈数据(怀来)科技产业园一期项目封顶 (中国建筑集团有限公司, 2022-06-06)
  6. 中建一局中标河北合盈数据(怀来)科技产业园项目 (澎湃新闻·澎湃号·政务, 2024-06-27)

More in Huailai

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.