CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心) is a data center project in Zhangjiakou, China, operated by CapitalOnline (首都在线). It is operational. The operator has not published an IT load figure. It is planned for 4,160 racks, with 832 in service. ArusGrid does not convert racks into MW.
Latest change on record: moved to operational on 12 October 2026. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Huailai holds 8 active projects with 1,294 MW of planned IT load between them, and CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心) has no published figure so it sits outside that ranking. Of those, 2 are operational, 5 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Huailai, and ArusGrid does not estimate one.
It is the only CapitalOnline project ArusGrid tracks. It sits on the CapitalOnline Huailai campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1, building 1# is under construction; Phase 2, buildings 2# and 3#, about 40 MW at 40 MW is announced. The dated record runs from under construction on 21 September 2026 to operational on 12 October 2026. The money on record is CN¥787.01m as of September 2026, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 12 October 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Phase 1 high-power racks leased in full to a major internet company for AI training (人民财讯, Oct 2026).
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.