ArusGridProject
Directory › China › Shaoguan › Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目)

Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目) data center

Qujiang Economic Development Zone, Shaoguan, Guangdong, China · Shaoguan market · location approximate to district level

Also listed as 秦淮数据韶关 and Chindata Shaoguan.

Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目) is a data center project in Qujiang Economic Development Zone, Shaoguan, China, operated by Chindata Group (秦淮数据集团). It has been announced and has not yet reached the land or permitting stage. It is planned for 200 MW of IT load.

Latest change on record: entered the record as announced on 1 October 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
200 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Chindata Group (秦淮数据集团)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Shaoguan holds 11 active projects with 200 MW of planned IT load between them, and Chindata Shaoguan Computing Cluster (秦淮数据韶关算力集群项目) ranks first by planned capacity. Of those, 4 are operational, 1 is operational and expanding, 3 are under construction, 1 is being commissioned and 2 are announced only. No third party publishes a colocation vacancy rate for Shaoguan, and ArusGrid does not estimate one.

Chindata has 4 others in China tracked by ArusGrid, including Chindata Huanshoudu Huailai Headquarters Base (秦淮数据环首都·怀来总部基地), Chindata Qingyang Zero-Carbon Data Centre Industrial Base (秦淮数据零碳数据中心产业基地) and Chindata Jining Intelligent Computing Centre, Ulanqab (秦淮数据集宁智算中心). It sits on the Chindata Shaoguan campus. Named funding comes from China Development Bank (new policy financial instrument, 136 million yuan equity) on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 1 October 2026. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.2.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 1 October 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

The city says the project mainly serves large-model training and inference.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · AnnouncedSize not published

Stage history

2026-10-01Announced · m.21jingji.com

Who is behind it

OperatorChindata Group (秦淮数据集团) · Colocation
Funder, EquityChina Development Bank (new policy financial instrument, 136 million yuan equity)

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated by韶关市政府 (framework agreement with 秦淮数据 and 东阳光集团) · 198 mu · Oct 2026 Reported source ↗
Water and cooling
CoolingHybrid air and liquid cooling · design PUE 1.197 Reported source ↗
风液混合 air plus liquid cooling system

Sources checked 2026-10-19

  1. 国开行1.36亿元新型政策性金融工具落地韶关 (21财经 (relaying 韶关发布), 2026-10-01)
  2. 广东韶关:扩大算力基础设施规模 推动联通与腾讯尽快签约确定新增50MW算力规模 (财联社, 2026-09-09)
  3. 85后东莞首富豪赌算力:280亿元鲸吞秦淮数据,百亿元大单客户成谜,负债率攀升 (虎嗅 (转载时代周报), 2026-05-09)
  4. 韶关市委书记陈少荣:选择韶关就是选择大湾区,投资韶关就是投资未来 (新浪财经 (看点资讯), 2026-06-12)

More in Shaoguan

Also run by Chindata

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.