China Mobile Greater Bay Area (Shaoguan) Data Centre is a data center project in Shaoguan, China, operated by China Mobile Guangdong (中国移动广东公司). It is operational. The operator has not published an IT load figure. It is planned for 32,000 racks, with 16,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational on 11 June 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Guangdong (中国移动广东公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Shaoguan holds 11 active projects with 200 MW of planned IT load between them, and China Mobile Greater Bay Area (Shaoguan) Data Centre has no published figure so it sits outside that ranking. Of those, 4 are operational, 1 is operational and expanding, 3 are under construction, 1 is being commissioned and 2 are announced only. No third party publishes a colocation vacancy rate for Shaoguan, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the Shaoguan data centre cluster start-up zone, Zhenjiang campus alongside China Unicom Greater Bay Area Hub (Shaoguan) Data Centre. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1, 16,000 racks is operational with a 2025 target; Phase 2, 16,132 standard racks is announced. The dated record runs from under construction on 1 August 2022 to operational on 11 June 2025. The money on record is CN¥5.6bn as of June 2025, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 9 public sources for this project, the latest dated 13 May 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Expected to support over 10,000P of intelligent computing once fully live (Jun 2025). Phase 2 includes 288 racks at 40kW.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 16,000 racks · OperationalSize not published, target 2025
Phase 2, 16,132 standard racks · AnnouncedSize not published

Stage history

2022-08-01Under construction · m.sfccn.com
2025-06-11Operational · news.ifeng.com

Who is behind it

OperatorChina Mobile Guangdong (中国移动广东公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-06CN¥5.6bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Project team
Main contractor中国建筑第四工程局有限公司 (中建四局) · Jul 2025 · completed Confirmed source ↗
Built phase 1: two 4-storey data centre buildings and one 3-storey power centre, 51,000 sqm, about 16,000 standard racks. Contract form and value not stated.
Land
Site73,333 sqm · May 2023 Reported source ↗
32,000 standard racks total, phase 1 18,000; total investment >56亿元 (2022-08-02) Source states 110 mu; converted at 666.7 sqm per mu.
Water and cooling
Coolingdesign PUE <1.25 Reported source ↗
Not stated
Coolingdesign PUE 1.248 Confirmed source ↗
Phase 2 equipment list names air conditioning, fans, UPS and HVDC; cooling type not specified.

Sources checked 2026-10-19

  1. 总投资约215亿!粤港澳大湾区枢纽韶关数据中心集群起步区首批项目集中开工 (南方财经网, 2022-08-02)
  2. 总投资56亿元 广东韶关新增一数据中心 (凤凰网, 2025-06-12)
  3. 广东省能源局发布中国移动、腾讯、华韶数据谷三大数据中心项目节能审查意见 (搜狐, 2024-11-12)
  4. 稳坐华南"算力之城",粤北小城刷出全国存在感 (南方财经网, 2026-05-13)
  5. 占地110亩!韶关这个国家级数据中心8月开工 (韶关日报 (澎湃新闻转载), 2023-05-19)
  6. 广东省能源局关于中国移动粤港澳(韶关)数据中心二期项目节能报告的审查意见 (广东省能源局, 2024-11-07)
  7. 中建四局承建的中国移动粤港澳(韶关)数据中心一期项目正式投产 (中国建筑集团有限公司, 2025-07-04)
  8. 总投资56亿!中移动粤港澳(韶关)数据中心一期项目开工 (韶关发布 (韶关日报社澎湃号), 2023-12-12)
  9. 中国移动粤港澳(韶关)数据中心正式运行! (中国日报网, 2025-12-10)

Same campus, Shaoguan data centre cluster start-up zone, Zhenjiang

More in Shaoguan

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.