China Mobile (Sichuan Chengdu) Data Center

Chengdu, Sichuan, China · Tianfu (Chengdu) market · location approximate to district level

China Mobile (Sichuan Chengdu) Data Center is a data center project in Chengdu, China, operated by China Mobile Sichuan (中国移动四川公司). It is operational and expanding. The operator has not published an IT load figure. It is planned for 19,000 racks, with 10,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as expanding on 25 June 2022. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Sichuan (中国移动四川公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Tianfu (Chengdu) holds 6 active projects with 0 MW of planned IT load between them, and China Mobile (Sichuan Chengdu) Data Center has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Tianfu (Chengdu), and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the Shuangliu District campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1, 10,000 racks is operational; Phase 2, 9,000 racks is under construction. The stage was recorded as operational and expanding on 25 June 2022.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 18 June 2024, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

China Mobile's Sichuan hub in Shuangliu installed its first 1,700 AI servers in Feb 2023. Whether that hub sits on this campus is not confirmed.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 10,000 racks · OperationalSize not published
Phase 2, 9,000 racks · Under constructionSize not published

Stage history

2022-06-25Expanding · static.cdsb.com

Who is behind it

OperatorChina Mobile Sichuan (中国移动四川公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Project team
Mechanical and electrical works中建安装集团有限公司 · Apr 2024 Reported source ↗
Ranked first in the award-result notice for 二期工程施工大机电一期工程施工标段 (phase 2, first M&E package). Tenderer 中国移动通信集团四川有限公司; supervised by 成都市双流区住房建设和交通局. Amount not shown.

Sources checked 2026-10-19

  1. 中国移动(四川成都)数据中心二期工程正式启动 (成都商报, 2022-06-25)
  2. 开局2023·拼的起手式⑩丨“冷”“热”之间,算力变得更智能 (四川在线, 2023-02-05)
  3. 制胜新赛道“算力蜀道”已畅通 (四川日报, 2024-06-18)
  4. 中国移动(四川成都)数据中心二期工程施工大机电一期工程施工标段结果公布 (必联网 (aggregator of tender result), 2024-04-12)

More in Tianfu (Chengdu)

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.