Liang'ang Cloud Data (Chengdu Jianyang) Base No. 1 (立昂云数据(成都简阳)一号基地) data center

Jianyang, Chengdu, Sichuan, China · Tianfu (Chengdu) market · location approximate to city level

Also listed as 立昂简阳数据中心.

Liang'ang Cloud Data (Chengdu Jianyang) Base No. 1 (立昂云数据(成都简阳)一号基地) is a data center project in Jianyang, Chengdu, China, operated by Liang'ang Cloud Data (Sichuan), a subsidiary of Liang'ang Technology (立昂技术). It is operational. The operator has not published an IT load figure. It is planned for 12,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational in September 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Liang'ang Cloud Data (Sichuan), a subsidiary of Liang'ang Technology (立昂技术)
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Tianfu (Chengdu) holds 6 active projects with 0 MW of planned IT load between them, and Liang'ang Cloud Data (Chengdu Jianyang) Base No. 1 (立昂云数据(成都简阳)一号基地) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Tianfu (Chengdu), and ArusGrid does not estimate one.

It is the only Liang'ang Technology project ArusGrid tracks. It sits on the Liang'ang Jianyang campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from under construction on 1 October 2022 to operational in September 2024. The money on record is CN¥5bn as of October 2022, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 11 public sources for this project, the latest dated 22 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published

Stage history

2022-10-01Under construction · cbgc.scol.com.cn
2024-09Operational · stcn.com

Who is behind it

OperatorLiang'ang Cloud Data (Sichuan), a subsidiary of Liang'ang Technology (立昂技术) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2022-10CN¥5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Construction supervisor公诚管理咨询有限公司 · Feb 2024 Reported source ↗
Site supervision of the Base No. 1 works (chief supervising engineer representative on site).
Civil and structural works北京城建二建设工程有限公司 · CNY 92m · Nov 2022 Confirmed source ↗
Civil works for phase 1 of Base No. 1 (土建工程(一期)). Work was 88.89 percent complete by contract value at 30 June 2023.
Land
Land seller简阳市 state land listing sale (挂牌出让) · CNY 11.86m · leasehold · Aug 2022 Confirmed source ↗
State construction land use right for parcel JYS2022-6(BZD) in 东溪街道, won at listing auction. The parcel area is not given in the filing. The March 2022 investment agreement planned about 105 mu gross and 73.77 mu net industrial land, which is 49,180.25 sqm at 666.67 sqm per mu.
Water and cooling
Coolingdesign PUE below 1.25 (agreement requirement) Confirmed source ↗
The investment agreement with the Jianyang government requires PUE below 1.25 and average rack occupancy of at least 65 percent once the project reaches full output.

Sources checked 2026-10-19

  1. 决战四季度 大干一百天丨总投资50亿!简阳又添“东数西算”硬支撑 (川观新闻 (Sichuan Daily), 2022-10-01)
  2. 立昂技术2025年加速AI与算力转型 营收7.3亿元资产减值致利润承压 (证券时报网 (STCN), 2026-04-22)
  3. 立昂技术股份有限公司2026年度以简易程序向特定对象发行股票募集资金使用的可行性分析报告 (cninfo (Liang'ang Technology filing), 2026-07-29)
  4. 立昂技术:立昂云数据(成都简阳)一号基地一期项目已正式进入试运营阶段并已有订单 (每日经济新闻 (新浪财经), 2025-03-05)
  5. 立昂技术股份有限公司2026年半年度报告 (巨潮资讯网 (cninfo), 2026-08-27)
  6. 走进工业园区看发展③ | 支撑打造地标建筑、做强数字底座 简阳这个功能区如何追“新”? (川观新闻, 2024-02-28)
  7. 立昂技术股份有限公司2023年半年度报告全文 (立昂技术股份有限公司 (深圳证券交易所), 2023-08-25)
  8. 立昂技术股份有限公司关于收到立昂云数据(成都简阳)一号基地一期建设项目节能报告的审查意见的公告 (立昂技术股份有限公司 (深圳证券交易所), 2022-08-03)
  9. 立昂技术股份有限公司关于与简阳市人民政府签署《投资协议》的公告 (立昂技术股份有限公司 (巨潮资讯网), 2022-03-17)
  10. 立昂技术股份有限公司2026年度以简易程序向特定对象发行股票募集资金使用的可行性分析报告 (立昂技术股份有限公司 (深圳证券交易所), 2026-07-29)
  11. 立昂技术股份有限公司关于全资子公司存续分立进展暨完成工商变更登记的公告 (立昂技术股份有限公司 (cninfo), 2026-09-22)

More in Tianfu (Chengdu)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.