ArusGridProject
Directory › China › Tianfu (Chengdu) › Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心)

Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心) data center

Tianfu Digital Valley, Jingyang District, Deyang, Sichuan, China · Tianfu (Chengdu) market · location approximate to district level

Also listed as 云上天府, 云上天府云计算中心 and Yunshang Tianfu.

Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心) is a data center project in Tianfu Digital Valley, Jingyang District, Deyang, China, operated by Sichuan Yunshang Tianfu Technology (四川云上天府科技有限公司). It is operational. The operator has not published an IT load figure. It is planned for 6,120 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational on 26 September 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Sichuan Yunshang Tianfu Technology (四川云上天府科技有限公司)
Local developer
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Tianfu (Chengdu) holds 6 active projects with 0 MW of planned IT load between them, and Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Tianfu (Chengdu), and ArusGrid does not estimate one.

It is the only Yunshang Tianfu project ArusGrid tracks. It sits on the Tianfu Digital Valley (天府数谷) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from under construction on 23 February 2022 to operational on 26 September 2023. The money on record is CN¥4bn as of May 2026, the announced investment. Cooling uses evaporative cooling, with a design PUE of 1.2.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 2 May 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2022-02-23Under construction · cbgc.scol.com.cn
2022-12-30Commissioning · cbgc.scol.com.cn
2023-09-26Operational · sichuan.scol.com.cn

Who is behind it

OperatorSichuan Yunshang Tianfu Technology (四川云上天府科技有限公司) · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-05CN¥4bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
CoolingEvaporative cooling · design PUE 1.2 Reported source ↗
Indirect evaporative cooling with free cooling, annual average PUE below 1.2 (design).

Sources checked 2026-10-19

  1. 算力的尽头是电力,四川如何把每一度电“吃干榨净”丨发现先进制造业“隐形翅膀”⑨ (川观新闻, 2026-05-02)
  2. 云上天府云计算中心具备通电条件 (Chuanguan report on power-ready status) (川观新闻, 2023-01-03)
  3. 德阳天府数谷云上天府大数据产业园建设 (Chuanguan report) (川观新闻, 2022-02-23)
  4. 市州观察丨前瞻布局数字发展赛道 打造数字经济发展新高地 德阳:“智慧”路上加“数”前行 (川观新闻 (四川日报), 2022-06-21)
  5. 可容纳10万台服务器 云上天府智算中心在德阳正式投运 (四川在线, 2023-09-27)

More in Tianfu (Chengdu)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.