ArusGridProject
Directory › China › Tianfu (Chengdu) › China Ya'an Big Data Industrial Park (中国·雅安大数据产业园)

China Ya'an Big Data Industrial Park (中国·雅安大数据产业园)

Ya'an, Sichuan, China · Tianfu (Chengdu) market · location approximate to city level

Also listed as 雅安大数据产业园, Ya'an Big Data Park and 川西数据.

China Ya'an Big Data Industrial Park (中国·雅安大数据产业园) is a data center project in Ya'an, China, operated by Sichuan Chuanxi Data Industry Co. (四川川西数据产业有限公司), core operator; park run by Ya'an Economic and Technological Development Zone. It is operational and expanding. The operator has not published an IT load figure. It is planned for 60,000 racks, with 45,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as expanding on 1 September 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Sichuan Chuanxi Data Industry Co. (四川川西数据产业有限公司), core operator; park run by Ya'an Economic and Technological Development Zone
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Tianfu (Chengdu) holds 6 active projects with 0 MW of planned IT load between them, and China Ya'an Big Data Industrial Park (中国·雅安大数据产业园) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Tianfu (Chengdu), and ArusGrid does not estimate one.

It is the only Chuanxi Data project ArusGrid tracks. Named users of the compute are Alibaba, ByteDance, China Mobile Sichuan (Ya'an branch), 天绛白泽(成都)科技有限公司 (Tianfu Jiangxi Laboratory token factory) and Tencent (reported, unconfirmed).

The stage was recorded as operational and expanding on 1 September 2026. Power comes from Local hydropower (supplier not named) (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 9 public sources for this project, the latest dated 4 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

A token factory opened in the park in August 2026 and serves Zhipu, Kimi and DeepSeek models (封面新闻, 2026-09-01). Park compute is stated as over 6,000P. No GPU tenant is tied to a building.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2026-09-01Expanding · cbgc.scol.com.cn

Who is behind it

OperatorSichuan Chuanxi Data Industry Co. (四川川西数据产业有限公司), core operator; park run by Ya'an Economic and Technological Development Zone · Colocation

Who uses the compute

Tenant · hyperscalerAlibaba · reported, unconfirmed

Park · as of 2026-04-22

川观新闻 says Alibaba and ByteDance have moved into the park. It does not name a building.

Source · 雅安税务护航大数据产业向“新”而行、向“绿”而进 (川观新闻, 2026-04-22)

Tenant · hyperscalerByteDance · reported, unconfirmed

Park · as of 2026-04-22

Same article, park-level statement only.

Source · 雅安税务护航大数据产业向“新”而行、向“绿”而进 (川观新闻, 2026-04-22)

Tenant · telcoChina Mobile Sichuan (Ya'an branch) · reported, unconfirmed

Runs Buildings 2 and 4 in the Ya'an Big Data Industrial Park with over 4,000 racks in service and 26,000 servers. Moved in early 2020 and has invested over 3 billion yuan. Described as the park's largest operator. · as of 2026-07-28

Article names the China Ya'an Big Data Industrial Park and China Mobile Ya'an's buildings in it.

Source · 算力在哪里之二:算力在川西的生态守护中 (C114通信网, 2026-07-28)

Tenant · GPU cloud天绛白泽(成都)科技有限公司 (Tianfu Jiangxi Laboratory token factory) · reported, unconfirmed

The Tianjiang Baize Token Factory, built by Tianfu Jiangxi Laboratory with the Ya'an ETDZ, uses the Ya'an Big Data Industry Park as its infrastructure. It sells model tokens and went into operation in August 2026. · as of 2026-09-01

Article states the zone provides the Ya'an Big Data Industry Park as the factory's infrastructure.

Source · 四川首个Token工厂落地雅安 点亮川西算力新版图 (封面新闻, 2026-09-01)

Runs compute here · hyperscalerTencent · reported, unconfirmed

Customer of the China Mobile Ya'an IDC cloud inside the park, alongside Alibaba, Douyin, 省农信社 and 华西集团 · as of 2026-07-28

Trade press lists 腾讯 among more than 20 IDC cloud customers

Source · 算力在哪里之二:算力在川西的生态守护中 (C114通信网, 2026-07-28)

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Design and build contractor依米康智能工程有限公司 (subsidiary of 依米康 300249) · CNY 118.61m · Jun 2020 Confirmed source ↗
Detailed design and general contracting for 川西数据IDC机房及配套设施建设项目(一期), covering generators, UPS and IT power, air conditioning, low voltage, fit out, lighting and gas suppression. Client is Sichuan Chuanxi Data. 120 calendar days.
Power supply
Power allocation or planLocal hydropower (supplier not named) · Jul 2026 Reported source ↗
Described as direct green hydropower supply (绿色水电直供) · Park level description in a bank feature. No utility, substation or kV is named. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 四川首个Token工厂落地雅安 点亮川西算力新版图 (封面新闻, 2026-09-01)
  2. 雅安税务护航大数据产业向“新”而行、向“绿”而进 (川观新闻, 2026-04-22)
  3. 招商引资优服务,雅安寻找城市发展“合伙人” (上游新闻 (via 网易号), 2026-08-06)
  4. 建行四川省分行:金融赋能“算电协同”发展 (新华财经, 2026-08-08)
  5. 依米康科技集团股份有限公司关于全资子公司中标川西数据IDC机房及配套设施建设项目的进展公告 (依米康科技集团股份有限公司 (深圳证券交易所), 2020-06-09)
  6. 算力在哪里之二:算力在川西的生态守护中 (C114通信网, 2026-07-28)
  7. 让水风光带来澎湃绿色算力 探寻算电协同四川实践 (C114通信网, 2026-09-04)
  8. 擦亮“中国雅云”名片,雅安集中签约项目总投资超150亿 (澎湃新闻 (澎湃四川), 2024-05-22)
  9. 建行四川省分行:金融支持向“绿”向“新” 赋能产业从“电”到“算” (川观新闻, 2026-07-27)

More in Tianfu (Chengdu)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.