Directory › China › Gui'an › China Mobile (Guizhou) Data Center

China Mobile (Guizhou) Data Center

Gui'an, Guizhou, China · Gui'an market · location approximate to city level

Also listed as 中国移动(贵州)数据中心, China Mobile Guiyang Data Center and 中国移动贵阳数据中心.

China Mobile (Guizhou) Data Center is a data center project in Gui'an, China, operated by China Mobile (中国移动). It is operational and expanding. It is planned for 90 MW of IT load.

Latest change on record: moved to expanding on 21 May 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
90 MW
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile (中国移动)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and China Mobile (Guizhou) Data Center ranks first by planned capacity. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the China Mobile Gui'an campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phases 1 and 2 is operational; Phase 3 is under construction; Phase 4 (buildings D1 and D2) at 90 MW is announced. The dated record runs from under construction on 16 December 2013 to operational and expanding on 21 May 2023. The money on record is CN¥2bn as of December 2013, the announced investment. Cooling uses evaporative cooling, with a design PUE of 1.2.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 16 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Beijing News (Aug 2026) says the Guizhou Mobile intelligent computing centre was upgraded into a token factory serving more than 10 billion token calls a day. That source does not say the centre sits on this campus.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phases 1 and 2 · OperationalSize not published
Phase 3 · Under constructionSize not published
Phase 4 (buildings D1 and D2) · Announced90 MW

Stage history

2013-12-16Under construction · yicai.com
2023-05-21Expanding · cn.chinadaily.com.cn

Who is behind it

OperatorChina Mobile (中国移动) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2013-12CN¥2bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Land
Site183,343 sqm · Dec 2013 Reported source ↗
About 275 mu converted at 666.7 sqm/mu. Counterparty not disclosed.
Water and cooling
CoolingEvaporative cooling · design PUE 1.196 Reported source ↗
蒸发冷磁悬浮相变冷却空调 plus 变频氟泵空调

Sources checked 2026-10-19

  1. 中国移动中国联通 贵州开建云计算中心 (Yicai, 2013-12-17)
  2. 【聚焦2023数博会】夯实算力底座 抢占发展先机|贵州以算力为基础,加快推进全国一体化算力网络国家(贵州)枢纽节点建设 (贵阳网 via China Daily, 2023-05-21)
  3. 聚焦2026数博会|东数西算,贵州算明白了三件事 (Beijing News, 2026-08-30)
  4. 14亿元!贵州移动数据中心机电新建工程施工总承包招标 (C114通信网, 2026-09-16)
  5. 绿色算力上“云端” | 探访贵安新区中国移动贵阳数据中心 (当代先锋网 (新浪财经), 2024-04-01)
  6. 贵安三个数据中心入选“2025年度国家绿色数据中心”名单 (贵阳晚报, 2025-11-13)

More in Gui'an

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.