Directory › China › Gui'an › China Southern Power Grid Green Smart Data Centre, Gui'an (南方电网绿色智慧数据中心)

China Southern Power Grid Green Smart Data Centre, Gui'an (南方电网绿色智慧数据中心)

Magang Industrial New City, Gui'an New Area, Guizhou, China · Gui'an market · location approximate to district level

Also listed as 南方能源大数据中心 and CSG Gui'an data centre.

China Southern Power Grid Green Smart Data Centre, Gui'an (南方电网绿色智慧数据中心) is a data center project in Magang Industrial New City, Gui'an New Area, China, operated by China Southern Power Grid (南方电网). It is operational. The operator has not published an IT load figure. It is planned for 5,000 racks, with 500 in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational in May 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
China Southern Power Grid (南方电网)
Local developer
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and China Southern Power Grid Green Smart Data Centre, Gui'an (南方电网绿色智慧数据中心) has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

It is the only China Southern Power Grid project ArusGrid tracks. It sits on the CSG Gui'an campus. The named user of the compute is China Southern Power Grid (confirmed).

The dated record runs from under construction on 17 June 2023 to operational in May 2025. The money on record is CN¥1.45bn as of November 2025, the announced investment. Cooling uses immersion cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 11 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published

Stage history

2023-06-17Under construction · rb.gywb.cn
2025-05Operational · wb.gywb.cn

Who is behind it

OperatorChina Southern Power Grid (南方电网) · Local developer

Who uses the compute

Own use · enterpriseChina Southern Power Grid · confirmed

as of 2025-11-13

The utility's own energy big data centre.

Source · 贵安三个数据中心入选“2025年度国家绿色数据中心”名单 (贵阳日报传媒集团 (Guiyang Daily Media, e-paper), 2025-11-13)

Money at this site

Announced investment, 2025-11CN¥1.45bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中国建筑第四工程局 (中建四局) · May 2025 · completed Reported source ↗
Builder of phase 1 of 南方能源大数据中心, which passed completion acceptance in May 2025.
Land
Allocated byNot named · 89,200 sqm · Nov 2025 Inferred by ArusGrid source ↗
Stated as 133.8 mu, converted to about 89,200 sqm.
Why we think so. The article states the 133.8 mu site but names no seller. Allocation by the Gui'an natural resources authority is inferred.
Water and cooling
CoolingImmersion cooling Reported source ↗
A 40-foot container with four immersion tanks. Heat leaves through an external closed-loop cooling tower.

Sources checked 2026-10-19

  1. 贵安三个数据中心入选“2025年度国家绿色数据中心”名单 (贵阳日报传媒集团 (Guiyang Daily Media, e-paper), 2025-11-13)
  2. “中国数谷”算启未来 (中国日报网 (China Daily Chinese), 2023-08-08)
  3. 贵安新区高质量发展 (贵阳日报, 2025-06-17)
  4. 贵安又一数据中心竣工 (光明网, 2025-05-29)
  5. 2024年贵州广思信息网络有限公司南方能源大数据中心建设项目(一期)第三方测试验证服务公开竞争性谈判采购公告 (南方电网供应链统一服务平台, 2024-12-25)
  6. Guizhou unveils first liquid-cooled computing cabin (eGuizhou (Guizhou provincial government English portal), 2026-08-11)

More in Gui'an

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.