Also listed as 美的贵安 and Midea Gui'an.
Midea Gui'an Cloud Data Center (美的贵安云数据中心) is a data center project in Gui'an New Area, China, operated by Midea Group (美的集团). It is operational. The operator has not published an IT load figure. It is planned for 10,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: moved to operational on 26 August 2026. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Gui'an holds 12 active projects with 90 MW of planned IT load between them, and Midea Gui'an Cloud Data Center (美的贵安云数据中心) has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.
It is the only Midea Group project ArusGrid tracks. The named user of the compute is Midea Group (confirmed).
The dated record runs from under construction on 6 January 2023 to operational on 26 August 2026. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.2.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 26 August 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Science and Technology Daily (2026-08-26) says more than 13,000 AI agents run on it every day.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
as of 2024-09-09
Midea's own cloud project: a data centre, a cloud platform and a software R&D centre.
Source · 入局数据中心建设运维,美的楼宇科技扩大ToB版图 | 科技前线 (钛媒体, 2024-09-09)
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Gui'an · All projects in China · All projects operational · Full directory