ArusGridProject
Directory › China › Gui'an › Industrial Bank Gui'an New Area Data Center

Industrial Bank Gui'an New Area Data Center

Gui'an, Guizhou, China · Gui'an market · location approximate to city level

Also listed as 兴业银行贵安新区数据中心 and CIB Gui'an data center.

Industrial Bank Gui'an New Area Data Center is a data center project in Gui'an, China, operated by Industrial Bank (兴业银行). It is under construction. The operator has not published an IT load figure. It is planned for 18,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 28 November 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Industrial Bank (兴业银行)
Local developer
AI workloads
Unlikely
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and Industrial Bank Gui'an New Area Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

It is the only Industrial Bank project ArusGrid tracks. The named user of the compute is Industrial Bank (confirmed).

The build is phased. Phase 1 is under construction; Phase 2 is announced. The stage was recorded as under construction on 28 November 2024. The money on record is CN¥6.88bn as of December 2024, the announced investment. Power comes from Industrial Bank Guiyang branch (owner), assets to be handed to the grid company through a dedicated substation at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 14 August 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusUnlikely

This is a bank's own-use enterprise data centre and no AI purpose is stated.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · Under constructionSize not published
Phase 2 · AnnouncedSize not published

Stage history

2024-11-28Under construction · rb.gywb.cn

Who is behind it

OperatorIndustrial Bank (兴业银行) · Local developer

Who uses the compute

Own use · enterpriseIndustrial Bank · confirmed

as of 2025-04-22

The bank's own data centre, alongside its Shanghai and Fuzhou centres.

Source · 兴业银行贵安新区数据中心完成地下施工 (贵阳日报, 2025-04-22)

Money at this site

Announced investment, 2024-12CN¥6.88bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中国建筑一局(集团)有限公司 · Oct 2024 Reported source ↗
贵安新区数据中心(一期)建筑工程施工
Land
Site177,333 sqm · Dec 2024 Reported source ↗
Two phases; ~26.1万 m2 GFA; 贵安新区马场产业新城 Source states 266 mu; converted at 666.7 sqm per mu.
Power supply
Dedicated substationIndustrial Bank Guiyang branch (owner), assets to be handed to the grid company · 126 MVA · 110kV · Jun 2025 Confirmed source ↗
Two new 110kV substations, Xingshu East and Xingshu West, each 1 x 63MVA in this phase, running as mutual backup. Each has two 110kV bays to the 220kV Linka and 220kV Wangguan substations. EPC budget 96.93 million yuan, 12 months. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 重大项目“加速跑”奋力冲刺“全年红”——贵安抢抓年底施工期加快推进项目建设 (贵阳日报, 2024-12-03)
  2. 兴业银行贵安新区数据中心完成地下施工 (贵阳日报, 2025-04-22)
  3. 商业银行斥资百亿,正在拼命建数据中心 (21世纪经济报道, 2025-08-14)
  4. 兴业银行贵安新区数据中心项目(一期)110kV变电站EPC总承包项目招标公告 (中国招标信息发布网 (tender notice republished from 贵阳市公共资源交易中心), 2025-06-30)

More in Gui'an

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.