Also listed as 腾讯贵安七星数据中心, Tencent Seven Star Data Center, 腾讯贵安七星洞库式数据中心 and Tencent Qixing disaster recovery data center.
Tencent Gui'an Qixing Data Center is a data center project in Gui'an, China, operated by Tencent (腾讯). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: moved to expanding on 13 January 2025. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Gui'an holds 12 active projects with 90 MW of planned IT load between them, and Tencent Gui'an Qixing Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.
Tencent has 5 others in China tracked by ArusGrid, including Tencent Western Cloud Computing Data Center, Tencent Huailai Dongyuan Cloud Data Centre (腾讯怀来东园云数据中心) and Tencent Huailai Ruibei Cloud Data Centre (腾讯怀来瑞北云数据中心). It sits on the Tencent Qixing campus. The named user of the compute is Tencent (confirmed).
The build is phased. Phase 1 (cave halls) is operational with a 2018 target; Later phases is under construction; Tencent intelligent computing centre is under construction. The dated record runs from under construction on 1 May 2018 to operational and expanding on 13 January 2025. Cooling uses air cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 1 September 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Guiyang Daily of 13 Jan 2025 reports construction of a Tencent intelligent computing centre started in 2024. Tencent's Gui'an electricity use rose 517.18% in 2024 per Guiyang Daily of 28 Aug 2025.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
as of 2022-02-19
Tencent self-build and disaster recovery centre.
Source · 腾讯:在“东数西算”贵州、京津冀、成渝等枢纽节点均有布局,将建成中国西部最大的单体数据中心 (IT之家, 2022-02-19)
An own-use build. No colocation price applies.
All projects in Gui'an · All projects in China · All Tencent projects · All projects operational and expanding · Full directory