Tencent Western Cloud Computing Data Center is a data center project in Chongqing, China, operated by Tencent (腾讯). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: moved to expanding in April 2020. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Chongqing holds 10 active projects with 0 MW of planned IT load between them, and Tencent Western Cloud Computing Data Center has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.
Tencent has 5 others in China tracked by ArusGrid, including Tencent Gui'an Qixing Data Center, Tencent Huailai Dongyuan Cloud Data Centre (腾讯怀来东园云数据中心) and Tencent Huailai Ruibei Cloud Data Centre (腾讯怀来瑞北云数据中心). It sits on the Liangjiang New Area campus. Named users of the compute are Changan Automobile and Chongqing e-government cloud platform (reported, unconfirmed).
The build is phased. Phase 1, 100,000 servers is operational with a 2018 target; Phase 2, total 200,000 servers is commissioning with a 2022 target. The dated record runs from operational in June 2018 to operational and expanding in April 2020. The money on record is CN¥4.5bn as of February 2022, the announced investment. Power comes from State Grid Chongqing through a dedicated substation at 220 kV.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 14 October 2025, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Phase 1 facility, one of over a hundred companies served · as of 2020-04-04
Chongqing Daily phase 2 groundbreaking report
Source · 腾讯数据中心将在渝建中国西部最大单体数据中心 (重庆日报, 2020-04-04)
Hosted at the existing phase 1 facility · as of 2020-04-04
Chongqing Daily phase 2 groundbreaking report
Source · 腾讯数据中心将在渝建中国西部最大单体数据中心 (重庆日报, 2020-04-04)
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.