Directory › China › Chongqing › China Mobile (Chongqing) Data Center

China Mobile (Chongqing) Data Center

Chongqing, China · Chongqing market · location approximate to district level

China Mobile (Chongqing) Data Center is a data center project in Chongqing, China, operated by China Mobile Chongqing (中国移动重庆公司). It is operational. The operator has not published an IT load figure. It is planned for 25,000 racks, with 13,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational in February 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Chongqing (中国移动重庆公司)
Telco
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Chongqing holds 10 active projects with 0 MW of planned IT load between them, and China Mobile (Chongqing) Data Center has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the Liangjiang Shuitu International Data Port campus alongside China Telecom Liangjiang Tenglong Data Center and China Unicom Southwest Data Center (Chongqing Shuitu). Named users of the compute are Tencent, Alibaba, Baidu and ByteDance (confirmed).

The build is phased. Phase 1, 5,000 racks is operational with a 2016 target; Phase 2, 8,000 racks is operational with a 2021 target; Phase 3, three data halls is announced. The dated record runs from operational in September 2016 to operational in February 2023. The money on record is CN¥10.38bn as of October 2019, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 21 November 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 5,000 racks · OperationalSize not published, target 2016
Phase 2, 8,000 racks · OperationalSize not published, target 2021
Phase 3, three data halls · AnnouncedSize not published

Stage history

2016-09Operational · m.thepaper.cn
2019-10Expanding · m.thepaper.cn
2021-06Operational · cq.people.com.cn
2023-02Operational · news.cnstock.com

Who is behind it

OperatorChina Mobile Chongqing (中国移动重庆公司) · Telco

Who uses the compute

Tenant · hyperscalerTencent · confirmed

Data node · as of 2023-02-09

Chongqing Daily names Tencent, ByteDance, Alibaba and Baidu as having data nodes at this campus.

Source · 中国移动(重庆)数据中心:这个“大脑中枢”将成标杆 (重庆日报, 2023-02-09)

Tenant · hyperscalerAlibaba · confirmed

Data node · as of 2023-02-09

Named by Chongqing Daily as having a data node at this campus.

Source · 中国移动(重庆)数据中心:这个“大脑中枢”将成标杆 (重庆日报, 2023-02-09)

Tenant · hyperscalerBaidu · confirmed

Data node · as of 2023-02-09

Named by Chongqing Daily as having a data node at this campus.

Source · 中国移动(重庆)数据中心:这个“大脑中枢”将成标杆 (重庆日报, 2023-02-09)

Tenant · hyperscalerByteDance · confirmed

Data node · as of 2023-02-09

Named by Chongqing Daily as having a data node at this campus.

Source · 中国移动(重庆)数据中心:这个“大脑中枢”将成标杆 (重庆日报, 2023-02-09)

Money at this site

Announced investment, 2019-10CN¥10.38bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 【建设】中国移动(重庆)数据中心二期在两江新区动工 (重庆发布, 2019-10-14)
  2. 中国移动(重庆)数据中心:这个“大脑中枢”将成标杆 (重庆日报, 2023-02-09)
  3. 重庆全力打造全国算网融合发展高地 (中国政府网, 2024-05-27)
  4. 两江水土国际数据港总体情况 (人民网重庆频道 (source 重庆市大数据应用发展管理局), 2022-04-28)
  5. 重庆日报 2025-11-21 第11版 (重庆移动专版) (重庆日报, 2025-11-21)

Same campus, Liangjiang Shuitu International Data Port

More in Chongqing

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.