China Telecom Liangjiang Tenglong Data Center

Chongqing, China · Chongqing market · location approximate to district level

China Telecom Liangjiang Tenglong Data Center is a data center project in Chongqing, China, operated by China Telecom Chongqing with Tenglong Holdings (中国电信重庆公司, 腾龙控股). It is operational. The operator has not published an IT load figure. It is planned for 7,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as operational in June 2019. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom Chongqing with Tenglong Holdings (中国电信重庆公司, 腾龙控股)
Telco
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Chongqing holds 10 active projects with 0 MW of planned IT load between them, and China Telecom Liangjiang Tenglong Data Center has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the Liangjiang Shuitu International Data Port campus alongside China Mobile (Chongqing) Data Center and China Unicom Southwest Data Center (Chongqing Shuitu). Named funding comes from Tenglong Holdings Group (腾龙控股集团). Named users of the compute are Tencent (confirmed) and ByteDance (reported, unconfirmed).

The build is phased. Phase 1, built for Tencent is operational with a 2019 target; Phase 2, 4,700 racks is operational with a 2020 target. The stage was recorded as operational in June 2019. The money on record is CN¥1.3bn as of July 2020, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 28 April 2022, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, built for Tencent · OperationalSize not published, target 2019
Phase 2, 4,700 racks · OperationalSize not published, target 2020

Stage history

2019-06Operational · guoqing.china.com.cn

Who is behind it

OperatorChina Telecom Chongqing with Tenglong Holdings (中国电信重庆公司, 腾龙控股) · Telco
Funder, Joint venture partnerTenglong Holdings Group (腾龙控股集团)

Who uses the compute

Tenant · hyperscalerTencent · confirmed

Phase 1 custom build · as of 2019-06-14

China.com.cn reports phase 1 was delivered as a custom build for Tencent.

Source · 总投资7亿元 中国电信两江腾龙数据中心一期落成投用 (中国网, 2019-06-14)

Tenant · hyperscalerByteDance · reported, unconfirmed

as of 2020-07-24

CRI names ByteDance among phase 2 users.

Source · 重庆:中国电信两江腾龙数据中心(二期)投用 (国际在线, 2020-07-24)

Money at this site

Announced investment, 2020-07CN¥1.3bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
Coolingdesign PUE 1.38 Confirmed source ↗
Phase 1 uses micro module 3.0 construction. Design PUE is 1.4 for phase 1 and 1.38 for phase 2.

Sources checked 2026-10-19

  1. 总投资7亿元 中国电信两江腾龙数据中心一期落成投用 (中国网, 2019-06-14)
  2. 重庆:中国电信两江腾龙数据中心(二期)投用 (国际在线, 2020-07-24)
  3. Huge West China data center expands in Liangjiang (Liangjiang New Area, 2020-07-24)
  4. 两江水土国际数据港总体情况 (人民网重庆频道 (source 重庆市大数据应用发展管理局), 2022-04-28)
  5. 总投资7亿元,中国电信重庆两江腾龙数据中心一期落成投用 (界面新闻 (from 两江新区官网), 2019-06-14)

Same campus, Liangjiang Shuitu International Data Port

More in Chongqing

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.