China Telecom Liangjiang Tenglong Data Center is a data center project in Chongqing, China, operated by China Telecom Chongqing with Tenglong Holdings (中国电信重庆公司, 腾龙控股). It is operational. The operator has not published an IT load figure. It is planned for 7,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as operational in June 2019. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Chongqing holds 10 active projects with 0 MW of planned IT load between them, and China Telecom Liangjiang Tenglong Data Center has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.
China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the Liangjiang Shuitu International Data Port campus alongside China Mobile (Chongqing) Data Center and China Unicom Southwest Data Center (Chongqing Shuitu). Named funding comes from Tenglong Holdings Group (腾龙控股集团). Named users of the compute are Tencent (confirmed) and ByteDance (reported, unconfirmed).
The build is phased. Phase 1, built for Tencent is operational with a 2019 target; Phase 2, 4,700 racks is operational with a 2020 target. The stage was recorded as operational in June 2019. The money on record is CN¥1.3bn as of July 2020, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 28 April 2022, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Phase 1 custom build · as of 2019-06-14
China.com.cn reports phase 1 was delivered as a custom build for Tencent.
Source · 总投资7亿元 中国电信两江腾龙数据中心一期落成投用 (中国网, 2019-06-14)
as of 2020-07-24
CRI names ByteDance among phase 2 users.
Source · 重庆:中国电信两江腾龙数据中心(二期)投用 (国际在线, 2020-07-24)
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.