ArusGridProject
Directory › China › Qingpu-Wujiang-Jiashan › China Telecom YRD National Hub Jiaxing Computing Centre (中国电信长三角国家枢纽嘉兴算力中心)

China Telecom YRD National Hub Jiaxing Computing Centre (中国电信长三角国家枢纽嘉兴算力中心)

Jiaxing, Zhejiang, China · Qingpu-Wujiang-Jiashan market · location approximate to district level

China Telecom YRD National Hub Jiaxing Computing Centre (中国电信长三角国家枢纽嘉兴算力中心) is a data center project in Jiaxing, China, operated by China Telecom (中国电信). It is operational and expanding. The operator has not published an IT load figure. It is planned for 15,600 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to expanding on 21 January 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom (中国电信)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingpu-Wujiang-Jiashan holds 6 active projects with 0 MW of planned IT load between them, and China Telecom YRD National Hub Jiaxing Computing Centre (中国电信长三角国家枢纽嘉兴算力中心) has no published figure so it sits outside that ranking. Of those, 2 are operational, 3 are operational and expanding and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Qingpu-Wujiang-Jiashan, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the Sino-Singapore Jiashan Modern Industrial Park (中新嘉善现代产业园). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1, 155,000 sqm is operational; Full scale is under construction with a 2027 target. The dated record runs from under construction on 16 August 2023 to operational and expanding on 21 January 2026. The money on record is CN¥5bn as of August 2023, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 21 January 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Core base for China Telecom's national cloud. Targets 1.35 x 10^17 FLOPS by 2027.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 155,000 sqm · OperationalSize not published
Full scale · Under constructionSize not published, target 2027

Stage history

2023-08-16Under construction · finance.sina.com.cn
2026-01-21Expanding · jsxc.gov.cn

Who is behind it

OperatorChina Telecom (中国电信) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2023-08CN¥5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Site86,524 sqm · Aug 2023 Reported source ↗
Source states about 129.78 mu, converted at 666.7 sqm per mu. Counterparty not disclosed. Land use rights in China are granted by the state.

Sources checked 2026-10-19

  1. 中国电信长三角国家枢纽嘉兴算力中心项目顺利开工 总投超50亿元 (观点地产网 (新浪财经转载), 2023-08-18)
  2. 长三角示范区数据中心集群多个算力基建项目有新进展 (新民晚报 (腾讯新闻), 2024-11-23)
  3. 【提示】长三角生态绿色一体化发展示范区数据中心集群建设取得新进展 (上海市青浦区人民政府, 2025-07-20)
  4. 长三角一体化|电力助力长三角一体化示范区数据中心建设提速 (嘉善新闻网, 2026-01-21)
  5. 中国电信长三角国家枢纽嘉兴算力中心项目一期(B6厂房(6号算力中心)等)工程监理项目中标候选人公示 (嘉兴市公共资源交易网, 2026-01-14)

More in Qingpu-Wujiang-Jiashan

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.