ArusGridProject
Directory › China › Qingpu-Wujiang-Jiashan › China Telecom Wujiang Computing Dispatch Centre (吴江算力调度中心)

China Telecom Wujiang Computing Dispatch Centre (吴江算力调度中心) data center

Suzhou, Jiangsu, China · Qingpu-Wujiang-Jiashan market · location approximate to district level

China Telecom Wujiang Computing Dispatch Centre (吴江算力调度中心) is a data center project in Suzhou, China, operated by China Telecom Suzhou (中国电信苏州分公司). It is operational and expanding. The operator has not published an IT load figure. It is planned for 10,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to expanding on 20 July 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom Suzhou (中国电信苏州分公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingpu-Wujiang-Jiashan holds 6 active projects with 0 MW of planned IT load between them, and China Telecom Wujiang Computing Dispatch Centre (吴江算力调度中心) has no published figure so it sits outside that ranking. Of those, 2 are operational, 3 are operational and expanding and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Qingpu-Wujiang-Jiashan, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the YRD Internet Innovation Demonstration Base, Taihu New City, Wujiang (吴江区太湖新城) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Intelligent computing centre (No.1 computing centre) is operational; Remaining computing buildings is under construction. The dated record runs from under construction on 24 February 2024 to operational and expanding on 20 July 2025. The money on record is CN¥3.5bn as of June 2024, the announced investment. Power comes from 国家电网 (State Grid) through a dedicated substation at 110 kV (reported, unconfirmed). Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 15 September 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Designed for over 5,000 PFLOPS. The intelligent computing centre opened first in Jun 2024 and hosts Tianyi Cloud's Xirang dispatch platform.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Intelligent computing centre (No.1 computing centre) · OperationalSize not published
Remaining computing buildings · Under constructionSize not published

Stage history

2024-02-24Under construction · news.2500sz.com
2024-06-26Operational · cs.com.cn
2025-07-20Expanding · shqp.gov.cn

Who is behind it

OperatorChina Telecom Suzhou (中国电信苏州分公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-06CN¥3.5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Site80 mu · Jun 2024 Reported source ↗
80亩 ≈ 53,336 sqm (converted at 666.7 sqm/mu). Counterparty not disclosed.
Power supply
Dedicated substation国家电网 (State Grid) · 100 MVA · 110kV · Sep 2025 Reported source ↗
New 110kV substation dedicated to the 长三角算力调度中心 (2×50MVA, 2 incoming 110kV circuits, 32 outgoing 10kV feeders), energised 2025-09-10. Phase-two supply works expected in service 2028. · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Liquid cooling, evaporative cooling and distributed air cooling, on China Telecom's prefabricated standard design.

Sources checked 2026-10-19

  1. 加快算力基础建设 以智算制胜以超算超越 (名城苏州新闻中心 (看苏州), 2024-02-24)
  2. “东数西算”长三角算力调度中心在苏州吴江启动 (上海证券报·中国证券网, 2024-06-26)
  3. 长三角示范区数据中心集群多个算力基建项目有新进展 (新民晚报 (腾讯新闻), 2024-11-23)
  4. 【提示】长三角生态绿色一体化发展示范区数据中心集群建设取得新进展 (上海市青浦区人民政府, 2025-07-20)
  5. 给AI“巨兽”装上能源心脏!长三角算力调度中心引爆数字经济新引擎 (扬子晚报, 2025-09-15)
  6. 江苏苏州大力发展算力产业 超常干劲超常力度打造样板 (中国江苏网 (苏州日报), 2023-12-07)

More in Qingpu-Wujiang-Jiashan

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.