ArusGridProject
Directory › China › Zhangjiakou › China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区)

China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区)

Zhangbei County, Zhangjiakou, Hebei, China · Zhangjiakou market · location approximate to district level

Also listed as 中国电信张北园区 and China Telecom Zhangbei.

China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) is a data center project in Zhangbei County, Zhangjiakou, China, operated by China Telecom (中国电信). It is at the land and permitting stage. It is planned for 150 MW of IT load.

Latest change on record: entered the record as land and permitting on 10 April 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
150 MW
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom (中国电信)
Telco
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Long shot0 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) ranks second by planned capacity. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Qingyang Computing Center and China Telecom Cloud Computing Chongqing Base (中国电信云计算重庆基地), Shuitu. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 10 April 2025. The money on record is CN¥1.45bn as of March 2026, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 12 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2025-04-10Land and permitting · sohu.com

Who is behind it

OperatorChina Telecom (中国电信) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-03CN¥1.45bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 不少于1.5万机柜!中国电信智慧云基地张北园区项目新进展 (搜狐 (citing the Hebei public resource trading platform), 2025-04-10)
  2. 中国电信智慧云基地张北园区项目土建1.2期工程总承包招标公告 (Tender notice (mirror), 2026-03-06)
  3. 中国电信集团有限公司智慧云基地张北园区建设运营中心2026年通信电源配套二期工程全过程咨询服务项目招标公告 (政府采购信息网 (caigou2003), 2026-08-12)

More in Zhangjiakou

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.