ArusGridProject
Directory › China › Zhangjiakou › Baosight Baozhiyun North China Base, Xuanhua (宝之云华北基地)

Baosight Baozhiyun North China Base, Xuanhua (宝之云华北基地) data center

Xuanhua District, Zhangjiakou, Hebei, China · Zhangjiakou market · location approximate to district level

Also listed as 宝之云华北, Baosight Xuanhua and 河北宝宣.

Baosight Baozhiyun North China Base, Xuanhua (宝之云华北基地) is a data center project in Xuanhua District, Zhangjiakou, China, operated by Hebei Baoxuan Data Technology (河北宝宣数据科技有限公司). It is operational. It is planned for 90 MW of IT load.

Latest change on record: moved to operational on 31 March 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
90 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Hebei Baoxuan Data Technology (河北宝宣数据科技有限公司)
wholesale
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and Baosight Baozhiyun North China Base, Xuanhua (宝之云华北基地) ranks third by planned capacity. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.

It is the only Baosight project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. A1 and A2 is operational with a 2025 target; A4, A5 and A6 at 90 MW is announced. The dated record runs from under construction on 16 September 2022 to operational on 31 March 2026. The money on record is CN¥1.74bn as of April 2025, the announced investment. Power comes from 宣钢新能源公司 (Xuangang New Energy) (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 31 March 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Baosight says the A4 to A6 investment answers demand for intelligent computing from AI large models and autonomous driving. No AI tenant is named.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

A1 and A2 · OperationalSize not published, target 2025
A4, A5 and A6 · Announced90 MW

Stage history

2022-09-16Under construction · dcworld.cn
2025-04-26Under construction · static.cninfo.com.cn
2026-03-31Operational · epaper.cs.com.cn

Who is behind it

OperatorHebei Baoxuan Data Technology (河北宝宣数据科技有限公司) · wholesale

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-04CN¥1.74bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerXuanhua Iron and Steel (宣钢), west plant area · Apr 2025 Confirmed source ↗
The base sits on the former Xuangang west plant site. Xuanhua Iron and Steel holds 12.09% of the operating company.
Power supply
Power allocation or plan宣钢新能源公司 (Xuangang New Energy) · Sep 2022 Reported source ↗
Green power to be supplied with Xuangang New Energy, plus solar and storage on site. No capacity given. · Applies to the whole campus.
Water and cooling
CoolingWater-cooled chillers Reported source ↗
The first building is described as a water cooled data centre with waste heat recovery.

Sources checked 2026-10-19

  1. 上海宝信软件股份有限公司关于投资宝之云华北基地A4A5A6楼项目的公告 (Baosight Software via cninfo (临2025-017), 2025-04-26)
  2. 上海宝信软件股份有限公司2025年年度报告摘要 (中国证券报, 2026-03-31)
  3. 宝信软件(600845):宝之云华北基地中标某互联网巨头项目 IDC业务回暖可期 (长江证券 (via 九方智投), 2024-09-24)
  4. 宝之云华北基地正式开工 项目整体规模为2万个8kW机柜 (数据中心世界, 2022-09-17)
  5. 宝信软件:中标某互联网巨头IDC项目 (证券时报网, 2024-09-22)

More in Zhangjiakou

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.