Also listed as 万润涿鹿 and Wanrun Zhuolu.
Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地) is a data center project in Zhuolu County, Zhangjiakou, China, operated by Wanrun Group (万润集团有限公司). It is under construction. The operator has not published an IT load figure. It is planned for 30,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as under construction on 26 April 2023. Record last checked against its sources on 19 October 2026.
Next gate to watch: Money committed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.
It is the only Wanrun project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as under construction on 26 April 2023. The money on record is CN¥5bn as of April 2023, the announced investment. Power comes from 北京万润数字科技有限公司 (project-built substations) through a dedicated substation at 110 kV (reported, unconfirmed). Cooling uses evaporative cooling, with a design PUE of 1.2.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 26 March 2024, and last checked the record on 19 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Built as an intelligent computing base. DC1 is a custom hall for high-performance servers at 10 to 12kW per rack.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Zhangjiakou · All projects in China · All projects under construction · Full directory