ArusGridProject
Directory › China › Zhangjiakou › Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地)

Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地) data center

Zhuolu County, Zhangjiakou, Hebei, China · Zhangjiakou market · location approximate to district level

Also listed as 万润涿鹿 and Wanrun Zhuolu.

Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地) is a data center project in Zhuolu County, Zhangjiakou, China, operated by Wanrun Group (万润集团有限公司). It is under construction. The operator has not published an IT load figure. It is planned for 30,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 26 April 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Wanrun Group (万润集团有限公司)
Local developer
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and Wanrun Zhuolu Intelligent Computing Industry Base (万润(涿鹿)智能算力产业基地) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.

It is the only Wanrun project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 26 April 2023. The money on record is CN¥5bn as of April 2023, the announced investment. Power comes from 北京万润数字科技有限公司 (project-built substations) through a dedicated substation at 110 kV (reported, unconfirmed). Cooling uses evaporative cooling, with a design PUE of 1.2.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 26 March 2024, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

Built as an intelligent computing base. DC1 is a custom hall for high-performance servers at 10 to 12kW per rack.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

DC1 · Under constructionSize not published

Stage history

2023-04-26Under construction · dc.idcquan.com

Who is behind it

OperatorWanrun Group (万润集团有限公司) · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2023-04CN¥5bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Site286 mu · Mar 2024 Reported source ↗
Power supply
Dedicated substation北京万润数字科技有限公司 (project-built substations) · 110kV · Nov 2023 Reported source ↗
Rooftop solar is part of the plan. · Two 110kV substations, each with dual feeds. The source says 每路配置4*63MW, which reads like transformer MVA, so no capacity is entered. High voltage diesel generators back up. · Applies to the whole campus.
Water and cooling
CoolingEvaporative cooling · design PUE 1.2 Reported source ↗
Indirect evaporative cooling units and fluorine pump air conditioning, with closed hot aisles and AI energy control.

Sources checked 2026-10-19

  1. 河北省重点项目——万润(涿鹿)智能算力产业基地开工奠基 (中国IDC圈, 2023-04-28)
  2. 总规模3万机柜 万润(涿鹿)智能算力产业基地首栋机楼封顶 (中国IDC圈, 2023-11-30)
  3. 算网融合、存算一体,万卡级智算中心——万润(涿鹿)智能算力产业基地项目 (信息化观察网 (infoobs.com), 2024-03-26)

More in Zhangjiakou

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.