Dawei Technology Zhangbei Computing Data Centre (大位科技张北算力数据中心)
Zhangbei County, Zhangjiakou, Hebei, China · Zhangjiakou market · location approximate to district level
Also listed as 张北榕泰算力数据中心 and Rongtai Zhangbei.
Dawei Technology Zhangbei Computing Data Centre (大位科技张北算力数据中心) is a data center project in Zhangbei County, Zhangjiakou, China, operated by Dawei Technology (大位科技, formerly Guangdong Rongtai 广东榕泰). It is operational. The operator has not published an IT load figure. It is planned for 12,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: moved to operational on 30 June 2026. Record last checked against its sources on 19 October 2026.
Planned IT load
Not published
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
Dawei Technology (大位科技, formerly Guangdong Rongtai 广东榕泰)
Colocation
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Where it sits
Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and Dawei Technology Zhangbei Computing Data Centre (大位科技张北算力数据中心) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.
It is the only Dawei Technology project ArusGrid tracks. It sits on the Dawei Zhangbei campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1 is operational; Phase 2 is announced with a 2026 target. The dated record runs from under construction on 10 August 2024 to operational on 30 June 2026.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 8 public sources for this project, the latest dated 30 September 2026, and last checked the record on 19 October 2026.
How well evidenced is it
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusLikely
The county announcement says the site will carry nearly 10,000P of compute. No AI tenant is named.
Access to AI chips
GradeLicence required for a party
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Phases
Phase 1 · OperationalSize not published
Phase 2 · AnnouncedSize not published, target 2026
Stage history
Who is behind it
OperatorDawei Technology (大位科技, formerly Guangdong Rongtai 广东榕泰) · Colocation
Who uses the compute
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
Colocation price per kW of IT load per month
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
Project team
Main contractor北京长空建设有限公司 (related party) · CNY 1,066,127,671.55m · Aug 2025 Confirmed source ↗ 张北数据中心一期60MW项目 construction, won by public tender; H1 2025 related-party transactions 1,066,127,671.55 yuan
Fit-out contractor凯基鼎世建设发展有限公司 · Jul 2024 Confirmed source ↗ Secondary structure, decoration, electrical, smart systems, fire, HVAC and signage for building 1 complex, DC building 2, pump room and site works. Works period 10 Aug 2024 to 13 Nov 2024. 25 million yuan paid.
Grid and substation works中科诺信(北京)安装工程有限公司 · Dec 2024 Confirmed source ↗ EPC for the 110kV overhead line from the 220kV Chabei and 220kV Yinsha substations to the Zhangbei site, with towers, cabling and earthworks. 67 million yuan paid by the reply date. Contract value not disclosed.
Power supply
Grid supply110kV · May 2025 Confirmed source ↗ 110kV overhead line feeds the site from the 220kV Chabei and 220kV Yinsha grid substations. The company also built a substation under the same EPC. No MVA is stated. · Applies to the whole campus.
Sources checked 2026-10-19
- 张北榕泰算力数据中心项目正式开工 (美丽张北 (Zhangbei County media centre) via 澎湃号·政务, 2024-08-13)
- 大位科技:截至2026年6月30日,张北数据中心一期60MW项目客户上架率为59.35% (同花顺财经 (citing 证券之星), 2026-09-30)
- 营收规模同比增长,上架率稳步爬坡——公司信息更新报告 (开源证券 (Kaiyuan Securities), 2026-08-25)
- 大位科技2025营收增长7.59% 经营现金流大幅改善 张北数据中心项目持续落地 (和讯网 (腾讯新闻), 2026-04-22)
- 大位数据科技(广东)集团股份有限公司2025年半年度报告 (巨潮资讯网 (cninfo), 2025-08-30)
- 关于上海证券交易所对公司2024年年度报告的信息披露监管问询函的回复公告 (大位数据科技(广东)集团股份有限公司 (SSE filing 2025-044), 2025-05-10)
- 热门算力概念股大位科技:百亿算力扩张声势先行,股价暴涨恰逢解禁 (钛媒体APP (腾讯新闻), 2025-03-20)
- 大位科技:公司张北数据中心项目不涉及算力租赁业务 (界面新闻 (东方财富网), 2026-02-10)
More in Zhangjiakou
All projects in Zhangjiakou · All projects in China · All projects operational · Full directory