ArusGridProject
Directory › China › Zhangjiakou › Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心)

Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心)

Zhangjiakou, Hebei, China · Zhangjiakou market · location approximate to city level

Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心) is a data center project in Zhangjiakou, China, operated by Alibaba Cloud (阿里云). It is under construction. The operator has not published an IT load figure. It is planned for 16,128 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to under construction on 19 February 2022. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Alibaba Cloud (阿里云)
hyperscaler
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhangjiakou holds 8 active projects with 540 MW of planned IT load between them, and Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are under construction, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Zhangjiakou, and ArusGrid does not estimate one.

Alibaba has 4 others in China tracked by ArusGrid, including Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地), Alibaba Cloud Western Cloud Computing Center and Data Service Base and Alibaba Cloud Ulanqab Data Center. It sits on the Alibaba Xuanhua, Xuanhua District campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from under construction on 16 September 2021 to under construction on 19 February 2022.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 2 public sources for this project, the latest dated 19 February 2022, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2021-09-16Under construction · c.m.163.com
2022-02-19Under construction · ithome.com

Who is behind it

OperatorAlibaba Cloud (阿里云) · hyperscaler

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 阿里云:在“东数西算”京津冀、内蒙古、成渝等枢纽节点均有布局 (IT之家, 2022-02-19)
  2. 总投资均超30亿元,阿里巴巴、宣钢数据中心项目集中开工 (网易, 2021-09-17)

More in Zhangjiakou

Also run by Alibaba

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.