Directory › China › Qingpu-Wujiang-Jiashan › Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地)

Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地) data center

Jiaxing, Zhejiang, China · Qingpu-Wujiang-Jiashan market · location approximate to district level

Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地) is a data center project in Jiaxing, China, operated by Alibaba Cloud (阿里云长三角(嘉善)信息科技有限公司). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to expanding on 20 July 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Alibaba Cloud (阿里云长三角(嘉善)信息科技有限公司)
hyperscaler
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Qingpu-Wujiang-Jiashan holds 6 active projects with 0 MW of planned IT load between them, and Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地) has no published figure so it sits outside that ranking. Of those, 2 are operational, 3 are operational and expanding and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Qingpu-Wujiang-Jiashan, and ArusGrid does not estimate one.

Alibaba has 4 others in China tracked by ArusGrid, including Alibaba Cloud Western Cloud Computing Center and Data Service Base, Alibaba Cloud Ulanqab Data Center and Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心). It sits on the Jiashan Economic and Technological Development Zone, Xitang (西塘镇) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Two buildings delivered and in operation is operational with a 2025 target; Remaining buildings of 10 planned is under construction. The dated record runs from under construction on 13 October 2023 to operational and expanding on 20 July 2025. The money on record is CN¥14.3bn as of October 2023, the announced investment. Power comes from State Grid Jiashan through a dedicated substation at 220 kV (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 21 January 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Designed for a 10,000-card AI cluster (万卡级智算集群) at full build.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Two buildings delivered and in operation · OperationalSize not published, target 2025
Remaining buildings of 10 planned · Under constructionSize not published

Stage history

2023-10-13Under construction · sohu.com
2025-07-20Expanding · shqp.gov.cn

Who is behind it

OperatorAlibaba Cloud (阿里云长三角(嘉善)信息科技有限公司) · hyperscaler

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2023-10CN¥14.3bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Dedicated substationState Grid Jiashan · 220kV · Jan 2026 Reported source ↗
Dedicated 220kV substation completed acceptance; before that, 49.7 MVA via six transitional dedicated lines. 2025 consumption 160 million kWh · Applies to the whole campus.

Sources checked 2026-10-19

  1. 总投资143亿元 阿里长三角智算基地主体结构封顶 (IDC圈 (搜狐), 2023-10-13)
  2. 关于阿里云长三角(嘉善)信息科技有限公司(阿里巴巴长三角智能计算基地(嘉善经济技术开发区)项目(数据中心C等))建设工程规划许可的批前公示、批后公告 (嘉善县人民政府, 2025-03-06)
  3. 【提示】长三角生态绿色一体化发展示范区数据中心集群建设取得新进展 (上海市青浦区人民政府, 2025-07-20)
  4. 长三角一体化|电力助力长三角一体化示范区数据中心建设提速 (嘉善新闻网, 2026-01-21)
  5. 长三角,有多能“算”? (潮新闻 via 凤凰网, 2025-08-22)
  6. 193亿,浙江嘉善两大(阿里巴巴、中国移动)智算项目加速推进 (搜狐, 2025-11-28)

More in Qingpu-Wujiang-Jiashan

Also run by Alibaba

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.