China Unicom Wujiang Computing Centre (中国联通吴江算力中心) is a data center project in Suzhou, China, operated by China Unicom Suzhou (中国联通苏州分公司). It is at the land and permitting stage. The operator has not published an IT load figure. It is planned for 10,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as land and permitting on 25 April 2025. Record last checked against its sources on 19 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Qingpu-Wujiang-Jiashan holds 6 active projects with 0 MW of planned IT load between them, and China Unicom Wujiang Computing Centre (中国联通吴江算力中心) has no published figure so it sits outside that ranking. Of those, 2 are operational, 3 are operational and expanding and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Qingpu-Wujiang-Jiashan, and ArusGrid does not estimate one.
China Unicom has 9 others in China tracked by ArusGrid, including China Unicom Zhongwei Cloud Data Center, China Unicom (Huailai) Big Data Innovation Industrial Park (中国联通(怀来)大数据创新产业园) and China Unicom Southwest Data Center (Chongqing Shuitu). It sits on the Wujiang Economic and Technological Development Zone, Yinjia Road and Guangming Road campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as at the land and permitting stage on 25 April 2025. The money on record is CN¥2.9bn as of April 2025, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 14 August 2026, and last checked the record on 19 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Filing describes 10,000 high-power compute racks.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.