China Unicom Southwest Data Center (Chongqing Shuitu)

Chongqing, China · Chongqing market · location approximate to district level

China Unicom Southwest Data Center (Chongqing Shuitu) is a data center project in Chongqing, China, operated by China Unicom Chongqing (中国联通重庆分公司). It is operational. The operator has not published an IT load figure. It is planned for 12,800 racks, with 7,687 in service. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as operational in 2014. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Unicom Chongqing (中国联通重庆分公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Chongqing holds 10 active projects with 0 MW of planned IT load between them, and China Unicom Southwest Data Center (Chongqing Shuitu) has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.

China Unicom has 9 others in China tracked by ArusGrid, including China Unicom Zhongwei Cloud Data Center, China Unicom (Huailai) Big Data Innovation Industrial Park (中国联通(怀来)大数据创新产业园) and China Unicom Western (Chongqing) Science City Digital Innovation Industry Base. It sits on the Liangjiang Shuitu International Data Port campus alongside China Mobile (Chongqing) Data Center and China Telecom Liangjiang Tenglong Data Center. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as operational in 2014. Power comes from 中国联合网络通信有限公司重庆市分公司 (substation owner); fed by two 110kV cables from existing 220kV substations through a dedicated substation at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 25 November 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Cloud pool expected to reach 6 PFLOPS by end 2025, including 4.65 PFLOPS of intelligent computing (Nov 2025).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2014Operational · h5.cqliving.com

Who is behind it

OperatorChina Unicom Chongqing (中国联通重庆分公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Dedicated substation中国联合网络通信有限公司重庆市分公司 (substation owner); fed by two 110kV cables from existing 220kV substations · 126 MVA · 110kV · Oct 2025 Confirmed source ↗
New 110kV substation inside the 中国联通西南数据中心 compound: this phase 2x63MVA (126 MVA), ultimate 3x63MVA (189 MVA). Project approval 渝两江经审﹝2023﹞229号; EIA accepted 2025-10-14. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 中国联通:以“数”为笔 擘画数字经济高质量发展“新图景” (国务院国资委, 2023-03-02)
  2. 中国联通执“向新之笔”擘画“8D魔幻之都”数智发展新蓝图 (央广网, 2024-10-15)
  3. 用AI联通 | 算力破局 全国布局! (新华网, 2025-11-25)
  4. 受理建设项目环评信息公告表(2023年中国联通重庆北部通信枢纽中心 110KV变电站新建工程) (重庆市生态环境局两江新区分局, 2025-10-14)

Same campus, Liangjiang Shuitu International Data Port

More in Chongqing

Also run by China Unicom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.