Runze (Southwest) International Information Port data center

Chongqing, China · Chongqing market · location approximate to district level

Runze (Southwest) International Information Port is a data center project in Chongqing, China, operated by Runze Intelligent Computing Technology Group (润泽智算科技集团, 300442.SZ). It is under construction. The operator has not published an IT load figure. It is planned for 32,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 18 December 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Runze Intelligent Computing Technology Group (润泽智算科技集团, 300442.SZ)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Chongqing holds 10 active projects with 0 MW of planned IT load between them, and Runze (Southwest) International Information Port has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.

It is the only Runze project ArusGrid tracks. It sits on the Taojia Town, Jiulongpo District campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. A-1 and A-2 is under construction; A-7 and A-8 AI computing buildings, about 8,000 racks is under construction with a 2025 target. The stage was recorded as under construction on 18 December 2023. Power comes from 润泽科技 (self-built) through a dedicated substation at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 29 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Buildings A-7 and A-8 are described as intelligent computing centres.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

A-1 and A-2 · Under constructionSize not published
A-7 and A-8 AI computing buildings, about 8,000 racks · Under constructionSize not published, target 2025

Stage history

2023-12-18Under construction · news.qq.com

Who is behind it

OperatorRunze Intelligent Computing Technology Group (润泽智算科技集团, 300442.SZ) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中建八局西南公司重庆分公司 · Dec 2023 Reported source ↗
Builder of 润泽(西南)国际信息港智算中心 (8 buildings, 256,000 sqm, 32,000 racks planned), started 2023-12-18.
Power supply
Dedicated substation润泽科技 (self-built) · 110kV · Apr 2025 Confirmed source ↗
Self-built 110kV substation started, expected in service within 2025; park energy quota secured · Applies to the whole campus.
Grid supply110kV · Jun 2025 Confirmed source ↗
Two single circuit 110kV lines feed the park. The 马润 line (3.405 km) comes from the 马岚垭 220kV substation and the 黄润 line (6.1 km) from the 黄荆堡 220kV substation. One line is in use and one is standby. Line investment is 92.7674 million yuan. No MVA is stated. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 重庆最大大数据总部基地开建,预计2025年投产 (上游新闻, 2023-12-18)
  2. 润泽智算科技集团股份有限公司2025 年年度报告 (润泽科技, 2026-04-10)
  3. 润泽智算科技集团股份有限公司投资者关系活动记录表(2025-001) (巨潮资讯 cninfo (300442.SZ), 2025-04-27)
  4. 润泽智算科技集团股份有限公司2026年半年度报告全文 (润泽智算科技集团股份有限公司 (深圳证券交易所披露), 2026-08-28)
  5. 机构调研丨AIDC+液冷概念+东数西算 这家公司已开启全球化算力网络布局 预计今年将交付超300MW算力中心 (东方财富网 (东方财富研究中心), 2026-04-14)
  6. 润泽科技(300442)2026半年报点评:AIDC收入占比已过半 海外布局进入兑现期 (格隆汇 (长江证券研报), 2026-09-29)
  7. 西部(重庆)科学城九龙坡片区农村路网建设项目(一期)—润泽马岚垭站/黄荆堡站出线110kV线路电力工程环境影响报告表 (重庆市九龙坡区生态环境局, 2025-06-17)

More in Chongqing

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.