ArusGridProject
Directory › China › Chongqing › China Mobile Chengdu-Chongqing (Chongqing) Jiangnan Data Center

China Mobile Chengdu-Chongqing (Chongqing) Jiangnan Data Center

Chongqing, China · Chongqing market · location approximate to district level

China Mobile Chengdu-Chongqing (Chongqing) Jiangnan Data Center is a data center project in Chongqing, China, operated by China Mobile Chongqing (中国移动重庆公司). It is operational. The operator has not published an IT load figure. It is planned for 10,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational on 24 March 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Chongqing (中国移动重庆公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Chongqing holds 10 active projects with 0 MW of planned IT load between them, and China Mobile Chengdu-Chongqing (Chongqing) Jiangnan Data Center has no published figure so it sits outside that ranking. Of those, 6 are operational, 1 is operational and expanding, 2 are under construction and 1 is announced only. No third party publishes a colocation vacancy rate for Chongqing, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the Chongqing Economic and Technological Development Zone campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1, over 5,000 racks is operational with a 2025 target; Phase 2 is announced. The dated record runs from under construction in August 2023 to operational on 24 March 2025. Cooling uses direct liquid cooling, with a design PUE of 1.23.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 21 November 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Launch coverage calls it an intelligent computing node of the Chengdu-Chongqing hub and names AI training and autonomous driving as uses. No GPU count stated.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, over 5,000 racks · OperationalSize not published, target 2025
Phase 2 · AnnouncedSize not published

Stage history

2023-08Under construction · app.cqrb.cn
2025-03-24Operational · cq.chinanews.com.cn

Who is behind it

OperatorChina Mobile Chongqing (中国移动重庆公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Project team
Main contractor中冶建工集团 (MCC) · Feb 2024 Reported source ↗
phase 1 construction: support building, power centre, two data halls
Land
Industrial estate重庆经济技术开发区 · 72.9 mu · Feb 2024 Confirmed source ↗
Seller not named.
Water and cooling
CoolingDirect liquid cooling · design PUE 1.23 Reported source ↗
冷板式液冷 cold-plate liquid cooling, plus HVDC and rooftop PV; 2024 report adds water-cooled system and cooling towers

Sources checked 2026-10-19

  1. 中国移动成渝(重庆)江南数据中心建设提速 今年重庆将再添一个超大型数据中心 (重庆日报, 2024-02-29)
  2. 中国移动成渝(重庆)江南数据中心正式投产 助推数字经济高质量发展 (中新网重庆, 2025-03-24)
  3. 中国移动成渝(重庆)江南数据中心投产 (人民网, 2025-03-24)
  4. 中国移动成渝(重庆)江南数据中心正式启动建设 (新浪财经, 2022-04-07)
  5. 重庆日报 2025-11-21 第11版 (重庆移动专版) (重庆日报, 2025-11-21)

More in Chongqing

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.