Also listed as 中国移动(宁夏中卫)数据中心B园区.
China Mobile Zhongwei Data Center, Park B is a data center project in Zhongwei, China, operated by China Mobile Ningxia (中国移动通信集团宁夏有限公司). It is operational. It is planned for 202 MW of IT load. The operator reports 202 MW running.
Latest change on record: entered the record as operational on 30 May 2026. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and China Mobile Zhongwei Data Center, Park B ranks 5th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.
China Mobile has 11 others in China tracked by ArusGrid, including China Mobile (Gansu Qingyang) Data Center, China Mobile Hohhot Data Center and China Mobile Zhongwei Data Center, Xuanhe Park. It sits on the China Mobile Zhongwei Data Center campus alongside China Mobile Zhongwei Data Center, Park A and China Mobile Zhongwei Data Center, Xuanhe Park. The named user of the compute is Alibaba (reported, unconfirmed).
The stage was recorded as operational on 30 May 2026. The money on record is CN¥6.15bn as of May 2026, the announced investment. Power comes from China Mobile Ningxia (substation owner); fed from the Datang 330kV booster station through a dedicated substation at 110 kV. Cooling uses evaporative cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 11 public sources for this project, the latest dated 2 September 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Built for AI computing with liquid and air cooling sharing one plant (科技日报, 9 Jul 2026).
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
as of 2025-10-28
科创中国 reports Alibaba in phase 1 of the B zone.
Source · 中卫数据中心集群建设加速 今年布局20个项目,概算总投资超28亿元 (科创中国, 2025-10-28)
No colocation price applies to this product (retail interconnection, no colocation price applies).
All projects in Zhongwei · All projects in China · All China Mobile projects · All projects operational · Full directory
Project team on other projects: Xiangjiang Systems Engineering Co., Ltd. (香江系统工程有限公司) · Huaxin Consulting Design Institute Co., Ltd. (华信咨询设计研究院有限公司)