Directory › China › Zhongwei › Jinko Power Zhongwei 1GW computing centre

Jinko Power Zhongwei 1GW computing centre data center

Zhongwei, Ningxia, China · Zhongwei market · location approximate to district level

Also listed as 晶科科技宁夏中卫1GW算力中心项目.

Jinko Power Zhongwei 1GW computing centre is a data center project in Zhongwei, China, operated by Jinko Power (晶科电力科技股份有限公司, 601778.SH). It has been announced and has not yet reached the land or permitting stage. It is planned for 1,000 MW of IT load.

Latest change on record: entered the record as announced on 16 April 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
1,000 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Jinko Power (晶科电力科技股份有限公司, 601778.SH)
Local developer
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and Jinko Power Zhongwei 1GW computing centre ranks second by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

It is the only Jinko Power project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 is announced; Phase 2 is announced; Phase 3 is announced. The stage was recorded as announced only on 16 April 2026. The money on record is CN¥24.5bn as of April 2026, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 11 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Stated purpose is a computing centre for AI.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · AnnouncedSize not published
Phase 2 · AnnouncedSize not published
Phase 3 · AnnouncedSize not published

Stage history

2026-04-16Announced · gu.sina.cn

Who is behind it

OperatorJinko Power (晶科电力科技股份有限公司, 601778.SH) · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-04CN¥24.5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated by中卫市人民政府 (investment agreement, 宣和片区) · 800 mu · Apr 2026 Reported source ↗

Sources checked 2026-10-19

  1. 晶科电力科技股份有限公司关于签署宁夏中卫算力中心项目投资协议的提示性公告 (SSE announcement via Sina, 2026-04-17)
  2. 245亿投资算力项目远超 “家底”!晶科科技深夜收监管函 (界面新闻, 2026-04-17)
  3. 245亿元投建算力中心,交易所火速发函,晶科科技:不愿错失战略机遇 (东方财富网, 2026-04-21)
  4. 浙江富豪,245亿“豪赌”算力 (界面新闻 (reprint of 侃见财经), 2026-04-25)
  5. 【调研快报】晶科科技接待交银施罗德基金等9家机构调研 (东方财富Choice数据 (天天基金网), 2026-08-11)

More in Zhongwei

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.