Also listed as 火山引擎宁夏中卫宣和算力中心.
Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1 is a data center project in Zhongwei, China, operated by Volcano Engine (火山引擎), permit holder 中卫朔方星河科技有限公司. It is at the land and permitting stage. It is planned for 7.47 MW of IT load.
Latest change on record: entered the record as land and permitting on 30 September 2026. Record last checked against its sources on 13 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1 ranks 8th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.
ByteDance has 3 others in China and 1 project elsewhere in the dataset tracked by ArusGrid, including Volcano Engine GW-scale Park, Hohhot, Volcano Engine GW-scale Computing Center, Ulanqab and Volcano Engine YRD Computing Centre (火山引擎长三角算力中心). The named user of the compute is ByteDance (reported, unconfirmed).
The stage was recorded as at the land and permitting stage on 30 September 2026.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 2 public sources for this project, the latest dated 10 October 2026, and last checked the record on 13 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Named a computing centre (算力中心) by the cloud arm of ByteDance. No source states GPU use.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
An own-use build. No colocation price applies.
All projects in Zhongwei · All projects in China · All ByteDance projects · All projects at the land and permitting stage · Full directory