Zhonglian Zero-Carbon AI Computing Park (Cloud Base)

Zhongwei, Ningxia, China · Zhongwei market · location approximate to city level

Also listed as 中联零碳智算(云基地)产业园.

Zhonglian Zero-Carbon AI Computing Park (Cloud Base) is a data center project in Zhongwei, China, operated by Zhonglian Data Group (中联数据集团). It is under construction. It is planned for 600 MW of IT load.

Latest change on record: entered the record as under construction on 28 July 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
600 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Zhonglian Data Group (中联数据集团)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and Zhonglian Zero-Carbon AI Computing Park (Cloud Base) ranks third by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

Zhonglian Data Group has 3 others in China tracked by ArusGrid, including Zhonglian Data South China HQ and South China Computing Centre, Shaoguan (中联数据华南总部暨华南算力中心项目), Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目) and Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 Building 1 at 75 MW is under construction with a 2026 target; Stage 1 total at 600 MW is announced. The stage was recorded as under construction on 28 July 2026. Power comes from State Grid Ningxia Zhongwei Power Supply Company through grid supply at 330 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 8 public sources for this project, the latest dated 17 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Stated purpose is AI computing (智算).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 Building 1 · Under construction75 MW, target 2026
Stage 1 total · Announced600 MW

Stage history

2026-07-28Under construction · china.com.cn

Who is behind it

OperatorZhonglian Data Group (中联数据集团) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Architect匡邑规划建筑设计研究院(上海)有限公司 · Apr 2025 Confirmed source ↗
Design unit for Zone A: 5 data centre buildings, office building and ancillary works, 258,495.52 sqm floor area on 200,000 sqm.
Land
Allocated byZhongwei Municipal People's Government (中卫市人民政府) · 200,000 sqm · leasehold · Apr 2025 Confirmed source ↗
Land use planning permit 地字第6405022025YG0015552号 to 宁夏卫联算都大数据科技有限公司 for Zone A. 土地取得:出让 (state land-use right granted by transfer). Approval 卫政土批字〔2025〕7号. Industrial land (cloud computing and big data centre), 300 mu. Term not stated.
Allocated byZhongwei Municipal People's Government (中卫市人民政府) · 130,603 sqm · leasehold · May 2026 Confirmed source ↗
Land use planning permit 6405022026YG0013687 to 宁夏中云智算数据科技有限公司 for Zone B, east of Zone A. 土地取得方式:出让 (state land-use right granted by transfer). Approval 卫政土批字〔2025〕28号. Industrial land, 195.9 mu. Term not stated.
Power supply
Power allocation or planJul 2026 Reported source ↗
Green direct supply (绿电直供); article quotes '绿电直供线路就架在园区'. · Supplier not named; Zhongwei's large-scale green direct-supply project is Datang's (500MW PV + 1.5GW wind), but this article does not name Datang as Zhonglian's supplier. · Applies to the whole campus.
Grid supplyState Grid Ningxia Zhongwei Power Supply Company · 330kV · Sep 2025 Confirmed source ↗
New 330kV line from the Shapotou substation to the 卫联算都 (Zhonglian) site, about 2 x 10.3km plus 0.2km on 30 towers, 36.56 million yuan. The on-site 330kV substation building got a permit on 2026-07-07. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 中卫绿电直供数据中心,发出电几乎全部变成算力 (人民日报 via 中国网, 2026-07-28)
  2. 宁夏中卫算力产业规模跃升 (经济日报, 2026-02-08)
  3. 国内头部算力企业中联数据集团算力中心项目落地中卫 (人民网宁夏, 2024-12-29)
  4. 中联数据集团加快西部布局,零碳算力双中心项目落地中卫 (中联数据集团, 2024-12-30)
  5. 中联零碳智算 (云基地)产业园A区项目局部优化调整规划设计方案批前公示 (中卫市自然资源局, 2026-09-17)
  6. 截至6月 宁夏中卫签约8个超大型智算中心项目 总投资1885亿元 绿电直供数据中心 成就一片投资热土(年中数据微视角) (人民日报, 2026-07-28)
  7. 中卫市生态环境局关于2025年9月26日作出的建设项目环境影响评价文件审批决定的公告 (中卫市人民政府 (中卫市生态环境局), 2025-09-26)
  8. 中联零碳智算(云基地)产业园A区项目330千伏变电站工程(14#变电站综合楼、15#电容器装置楼)建设工程规划许可证证后公示 (中卫市人民政府 (中卫市自然资源局), 2026-07-08)

More in Zhongwei

Also run by Zhonglian Data Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.