Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目) is a data center project in Ulanqab, China, operated by Zhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司). It is under construction. The operator has not published an IT load figure. It is planned for 11,500 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 19 August 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Zhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目) has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

Zhonglian Data Group has 3 others in China tracked by ArusGrid, including Zhonglian Zero-Carbon AI Computing Park (Cloud Base), Zhonglian Data South China HQ and South China Computing Centre, Shaoguan (中联数据华南总部暨华南算力中心项目) and Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A. It sits on the Jining big data industrial park, Chahar High-tech Zone. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 is under construction; Phase 2 is announced. The stage was recorded as under construction on 19 August 2024. The money on record is CN¥2.6bn as of March 2025, a government approval ceiling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 17 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Named an intelligent computing (智算) centre with 12kW racks.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · Under constructionSize not published
Phase 2 · AnnouncedSize not published

Stage history

2024-08-19Under construction · cnispgroup.com

Who is behind it

OperatorZhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Approved by a government investment agency, 2025-03CN¥2.6bn

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 中联数据集团再落重子 乌兰察布算力版图又添新项目 (中联数据集团, 2024-08-20)
  2. 321亿!内蒙古7个算力项目备案获批 (IDCE (中国国际数据中心展))
  3. 国内头部大厂齐聚乌兰察布圈地 (投资界 (pedaily), 2026-08-17)
  4. 321亿!内蒙古7个算力项目备案获批 (IDCE数据中心展 (搜狐网), 2025-03-12)

More in Ulanqab

Also run by Zhonglian Data Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.