Huawei Cloud Ulanqab Data Center

Ulanqab, Inner Mongolia, China · Ulanqab market · location approximate to district level

Also listed as 华为云乌兰察布数据中心, 华为数据中心一期, 华为二期, 华为数据三期 and Huawei Ulanqab.

Huawei Cloud Ulanqab Data Center is a data center project in Ulanqab, China, operated by Huawei Cloud (华为云). It is operational. The operator has not published an IT load figure. It is planned for 35,000 racks, with 6,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as operational on 22 August 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Huawei Cloud (华为云)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and Huawei Cloud Ulanqab Data Center has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

Huawei has 3 others in China tracked by ArusGrid, including Huawei Cloud Gui'an Data Center, Huawei Cloud North China (Horinger) Data Center and Huawei Cloud East China (Wuhu) Data Centre (华为云华东(芜湖)数据中心). It sits on the Huawei Ulanqab campus. Named users of the compute are Ulanqab municipal government cloud (乌兰察布政务云) and Huawei Cloud (华为云) (reported, unconfirmed).

The build is phased. Phase 1 is operational with a 2016 target; Phases 2 to 4. The stage was recorded as operational on 22 August 2023. The money on record is CN¥6bn as of September 2023, the announced investment. Cooling uses evaporative cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 20 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

A hyperscaler self-build. Science and Technology Daily (2026-08-20) says Huawei launched Ascend AI supernode cloud services in Ulanqab but does not name the building.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published, target 2016
Phases 2 to 4Size not published

Stage history

2023-08-22Operational · news.pedaily.cn

Who is behind it

OperatorHuawei Cloud (华为云) · Hyperscaler self-build

Who uses the compute

Runs compute here · governmentUlanqab municipal government cloud (乌兰察布政务云) · reported, unconfirmed

Phase 1 (2016, 1,500 racks) mainly served the government cloud · as of 2023-08-22

Article says phase 1 mainly served the Ulanqab government cloud.

Source · 「追风」的西北小城:从卖马铃薯,到风电之都 (投资界 (转载自36碳), 2023-08-22)

Own useHuawei Cloud (华为云) · reported, unconfirmed

From 2018 the site carried Huawei Cloud public cloud, process IT, rendering and remote disaster recovery · as of 2023-08-22

Article says the site expanded to Huawei Cloud services from 2018.

Source · 「追风」的西北小城:从卖马铃薯,到风电之都 (投资界 (转载自36碳), 2023-08-22)

Money at this site

Announced investment, 2023-09CN¥6bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Water and cooling
WaterHuawei (own) Reported source ↗
A Huawei official said annual average PUE can be brought down to 1.15 (operating figure, not a design value).
CoolingEvaporative cooling Reported source ↗
Natural cold source plus Huawei's new-generation indirect evaporative cooling; iCooling energy optimisation.

Sources checked 2026-10-19

  1. 「追风」的西北小城:从卖马铃薯,到风电之都 (Pedaily (36碳), 2023-08-22)
  2. 分析丨大厂数据中心纷纷落地,算力的出路在乌兰察布? (Tencent News, 2023-09-01)
  3. Token,Token,国内头部大厂齐聚乌兰察布圈地 (Huxiu (Economic Observer), 2026-08-16)
  4. 华为在内蒙古建设我国北方最大的算力枢纽集群 (新华网内蒙古频道, 2023-10-20)
  5. 乌兰察布华为北方云数据中心二期工程介绍 (乌兰察布市华创信息产业投资集团有限公司, 2017-07-16)
  6. 乌兰察布:从“算力工厂”到“词元牧场” (科技日报, 2026-08-20)

More in Ulanqab

Also run by Huawei

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.