Also listed as 乌兰察布快手星河数据中心 and 乌兰察布快手星河数据中心建设项目.
Kuaishou Xinghe Data Center, Ulanqab is a data center project in Jining, China, operated by Kuaishou (快手). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as land and permitting on 16 August 2026. Record last checked against its sources on 19 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and Kuaishou Xinghe Data Center, Ulanqab has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.
Kuaishou has 2 others in China tracked by ArusGrid, including Kuaishou Horinger Computing Centre (快手和林格尔新区算力项目) and Kuaishou Intelligent Cloud Ulanqab Data Center. It sits on the Kuaishou Ulanqab campus alongside Kuaishou Intelligent Cloud Ulanqab Data Center. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as at the land and permitting stage on 16 August 2026.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 17 August 2026, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
A 2026 self-build by a company that trains its own video generation models.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Built for Kuaishou (快手)'s own use. No customer workload has been tied to this building on the public record.
An own-use build. No colocation price applies.
All projects in Ulanqab · All projects in China · All Kuaishou projects · All projects at the land and permitting stage · Full directory