ArusGridProject
Directory › China › Ulanqab › CICC Data Ulanqab Low-Carbon Computing Base

CICC Data Ulanqab Low-Carbon Computing Base data center

Ulanqab, Inner Mongolia, China · Ulanqab market · location approximate to district level

Also listed as 中金数据乌兰察布低碳算力基地, 中金数据中心, 中金数据低碳算力基地 and CICC Data Ulanqab.

CICC Data Ulanqab Low-Carbon Computing Base is a data center project in Ulanqab, China, operated by China Financial Data Group (中金数据集团). It is operational and expanding. The operator has not published an IT load figure. It is planned for 25,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to expanding on 16 August 2026. Record last checked against its sources on 16 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Financial Data Group (中金数据集团)
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and CICC Data Ulanqab Low-Carbon Computing Base has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

CICC Data has 1 other in China tracked by ArusGrid, including CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 is operational; Phase 2 is under construction with a 2027 target. The dated record runs from under construction in 2023 to operational and expanding on 16 August 2026. The money on record is CN¥9.1bn as of July 2025, the announced investment. Power comes from 中金数据 源网荷储一体化项目 (黄茂营风光储电站) through a renewable power purchase agreement (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 12 October 2026, and last checked the record on 16 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published
Phase 2 · Under constructionSize not published, target 2027

Stage history

2023Under construction · news.10jqka.com.cn
2025-07Operational · news.10jqka.com.cn
2026-08-16Expanding · cj.sina.com.cn

Who is behind it

OperatorChina Financial Data Group (中金数据集团) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-07CN¥9.1bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorBeijing Urban Construction Group No.2 Company (北京城建二公司) · Sep 2026 · completed Confirmed source ↗
Built (承建) the 中金数据 Ulanqab zero-carbon cluster: Zone ABC (574 mu, about 25,000 racks), the wind-solar-storage project's roads, 96 km of collector lines and 234 towers, and Zone D (530 mu). The source does not say whether it was sole contractor.
Land
Site382,667 sqm · Jul 2025 Reported source ↗
45万 m2 GFA, 12 computing-room buildings, ~2.5万 racks, est. investment 91亿元 Source states 574 mu; converted at 666.7 sqm per mu.
Power supply
Renewable power deal中金数据 源网荷储一体化项目 (黄茂营风光储电站) · Jul 2025 Reported source ↗
Matched generation of 300MW, not data centre load. 200MW wind + 100MW PV + 45MW storage; green power direct via dedicated line to the computing centre 16km away; grid-connected 2025-07-15; described as China's first DC source-grid-load-storage green direct supply project · Generation capacity, not IT load; step-down substation kV not stated · Applies to the whole campus.

Sources checked 2026-10-16

  1. 45MW/180MWh!全国首个数据中心源网荷储一体化绿电直供项目投运 (Solarbe, 2025-07-18)
  2. 算热土乌兰察布 (Economic Observer via Sina Finance, 2026-08-16)
  3. 世界算力竞逐,内蒙古何以崛起? (新华每日电讯, 2026-10-12)
  4. 向西一步,乌兰察布 (北京城建发展官微 via 同花顺, 2026-09-24)
  5. 国内头部大厂齐聚乌兰察布圈地 (投资界 (pedaily), 2026-08-17)

More in Ulanqab

Also run by CICC Data

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.