Also listed as 优刻得乌兰察布数据中心 and UCloud Wulanchabu.
UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心) is a data center project in Jining District, Ulanqab (Chahar High-Tech Zone), China, operated by UCloud Technology (优刻得). It is operational and expanding. It is planned for 62 MW of IT load.
Latest change on record: entered the record as expanding on 18 June 2026. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心) ranks second by planned capacity. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.
It is the only UCloud project ArusGrid tracks. It sits on the UCloud Ulanqab campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Buildings A to C at 62 MW is operational; Buildings D and E is under construction. The stage was recorded as operational and expanding on 18 June 2026. Cooling uses immersion cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 8 public sources for this project, the latest dated 7 September 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
The operator calls it an intelligent computing centre and runs AI inference capacity there; rack utilisation was over 95% at 30 June 2026.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Ulanqab · All projects in China · All projects operational and expanding · Full directory