ArusGridMarket
Directory › China › Ulanqab

Data center projects in Ulanqab

China · China · dataset updated 2026-10-18

ArusGrid tracks 18 active data center projects in Ulanqab, China, with 1,262 MW of planned IT load. Of these, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only.

The largest project is VNET Ulanqab Cloud and AI Computing Center at 1,200 MW, operational and expanding. The operators with the most planned capacity here are VNET (1,200 MW across 1 project), UCloud (62 MW across 1 project) and Kuaishou (2 projects). No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
VNET Ulanqab Cloud and AI Computing CenterUlanqabExpanding1,200undisclosedVNET Group (世纪互联)Likely
UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心)Jining District, Ulanqab (Chahar High-Tech Zone)Expanding62undisclosedUCloud Technology (优刻得)Confirmed
Alibaba Cloud Ulanqab Data CenterUlanqabExpandingnone publishedundisclosedAlibaba Cloud (阿里云)Confirmed
Apple Inner Mongolia iCloud Data CenterUlanqabOperationalnone publishedundisclosedApple (local operating company not named)No signal either way
CICC Data Ulanqab Low-Carbon Computing BaseUlanqabExpanding25,000 racks *undisclosedChina Financial Data Group (中金数据集团)No signal either way
Chindata Jining Intelligent Computing Centre, Ulanqab (秦淮数据集宁智算中心)UlanqabAnnouncednone publishedundisclosedChindata (秦淮数据)Likely
DeepSeek Ulanqab data centre (DeepSeek乌兰察布数据中心)UlanqabAnnouncednone publishedundisclosedDeepSeek (杭州深度求索人工智能基础技术研究有限公司)Likely
Envision Ulanqab Xinghe (Galaxy) BaseUlanqabOperationalnone publishedundisclosedEnvision Group (远景科技集团)Confirmed
GDS Ulanqab GW-class green-power data centre cluster (万国数据乌兰察布GW级绿电直连数据中心集群)UlanqabAnnouncednone publishedundisclosedGDS Holdings (万国数据)Likely
GLP Ulanqab GW-class Green Power Intelligent Computing Base (普洛斯乌兰察布GW级源网荷储一体化智算产业基地)UlanqabAnnouncednone publishedundisclosedGLP (普洛斯)Likely
Huawei Cloud Ulanqab Data CenterUlanqabOperational35,000 racks (6,000 live) *undisclosedHuawei Cloud (华为云)Likely
Huayi Yunlian Jining Intelligent Computing Centre, Ulanqab (华一云联集宁智算中心)UlanqabAnnouncednone publishedundisclosedHuayi Yunlian (华一云联)Likely
Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目)UlanqabUnder construction11,500 racks *undisclosedZhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司)Likely
Jinkai New Energy Ulanqab 496.8MW Green Intelligent Computing Centre (金开新能乌兰察布496.8MW绿色智算中心项目)UlanqabLand and permittingnone publishedundisclosedJinkai New Energy (金开新能, SSE 600821)Likely
Kuaishou Intelligent Cloud Ulanqab Data CenterUlanqabOperational20,000 racks *undisclosedKuaishou Intelligent Cloud (Ulanqab) Technology (快手智能云(乌兰察布)科技有限公司)Likely
Kuaishou Xinghe Data Center, UlanqabJiningLand and permittingnone publishedundisclosedKuaishou (快手)Likely
Volcano Engine GW-scale Computing Center, UlanqabUlanqabAnnouncednone publishedundisclosedVolcano Engine (火山引擎, ByteDance)Likely
Zhonglian Yungang Jining Intelligent Computing Centre, Ulanqab (中联云港集宁智算中心)UlanqabAnnouncednone publishedundisclosedZhonglian Yungang (中联云港)Likely

Other markets in China

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.