Directory › China › Horinger and Hohhot

Data center projects in Horinger and Hohhot

China · China · dataset updated 2026-10-18

ArusGrid tracks 10 active data center projects in Horinger and Hohhot, China, with 298 MW of planned IT load. Of these, 3 are operational, 1 is operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 3 are announced only.

The largest project is China Mobile Hohhot Data Center at 120 MW, operational. The operators with the most planned capacity here are China Mobile (120 MW across 1 project), Sinnet (90 MW across 1 project) and Yungang Intelligent (88 MW across 1 project). No third party publishes a colocation vacancy rate for Horinger and Hohhot, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
China Mobile Hohhot Data CenterHoringerOperational120undisclosedChina Mobile (中国移动)Confirmed
Sinnet Horinger Intelligent Computing CenterHoringerAnnounced90undisclosedBeijing Sinnet Technology (光环新网, SZ300383)Likely
Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目)Horinger New Area, HohhotLand and permitting88undisclosedYungang Intelligent Technology (Hohhot) Co. (云港智能科技(内蒙古自治区呼和浩特市)有限公司)Likely
Bank of Communications Horinger New Area Data Center (交通银行和林格尔新区数据中心)Horinger New Area, HohhotUnder construction10,000 racks *undisclosedBank of Communications (交通银行)Unlikely
CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目)Horinger New Area, HohhotLand and permitting81,730 racks *undisclosedShengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data projectNo signal either way
China Telecom Cloud Computing Inner Mongolia Information ParkHoringerOperational100,000 racks *undisclosedChina Telecom (中国电信)Confirmed
China Unicom Hohhot Cloud Data Centre (中国联通呼和浩特云数据中心)HohhotExpanding30,000 racks (10,800 live) *undisclosedChina Unicom Inner Mongolia (中国联通内蒙古分公司)Confirmed
Huawei Cloud North China (Horinger) Data CenterHoringerOperationalnone publishedundisclosedHuawei Cloud (华为云)Confirmed
Kuaishou Horinger Computing Centre (快手和林格尔新区算力项目)Horinger New Area, HohhotAnnouncednone publishedundisclosedKuaishouLikely
Volcano Engine GW-scale Park, HohhotHohhotAnnouncednone publishedundisclosedVolcano Engine (火山引擎, ByteDance)Likely

Cities in this market

Other markets in China

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.