ArusGrid tracks 4 active data center projects in Horinger, China, with 210 MW of planned IT load. Of these, 3 are operational and 1 is announced only.

Horinger sits in the Horinger and Hohhot market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is China Mobile Hohhot Data Center at 120 MW, operational. The operators with the most planned capacity here are China Mobile (120 MW across 1 project), Sinnet (90 MW across 1 project) and China Telecom (1 project).

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
China Mobile Hohhot Data CenterHoringerOperational120undisclosedChina Mobile (中国移动)Confirmed
Sinnet Horinger Intelligent Computing CenterHoringerAnnounced90undisclosedBeijing Sinnet Technology (光环新网, SZ300383)Likely
China Telecom Cloud Computing Inner Mongolia Information ParkHoringerOperational100,000 racks *undisclosedChina Telecom (中国电信)Confirmed
Huawei Cloud North China (Horinger) Data CenterHoringerOperationalnone publishedundisclosedHuawei Cloud (华为云)Confirmed

Market pages

Other cities in China

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.