China · dataset updated 2026-10-18

ArusGrid tracks 4 active data center projects in Horinger New Area, China, with 88 MW of planned IT load. Of these, 1 is under construction, 2 are at the land and permitting stage and 1 is announced only.

Horinger New Area sits in the Horinger and Hohhot market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目) at 88 MW, at the land and permitting stage. The operators with the most planned capacity here are Yungang Intelligent (88 MW across 1 project), Bank of Communications (1 project) and CICC Data (1 project).

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目)Horinger New Area, HohhotLand and permitting88undisclosedYungang Intelligent Technology (Hohhot) Co. (云港智能科技(内蒙古自治区呼和浩特市)有限公司)Likely
Bank of Communications Horinger New Area Data Center (交通银行和林格尔新区数据中心)Horinger New Area, HohhotUnder construction10,000 racks *undisclosedBank of Communications (交通银行)Unlikely
CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目)Horinger New Area, HohhotLand and permitting81,730 racks *undisclosedShengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data projectNo signal either way
Kuaishou Horinger Computing Centre (快手和林格尔新区算力项目)Horinger New Area, HohhotAnnouncednone publishedundisclosedKuaishouLikely

Market pages

Other cities in China

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.