CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目) data center

Horinger New Area, Hohhot, Inner Mongolia, China · Horinger and Hohhot market · location approximate to district level

Also listed as 中金数据和林格尔 and CICC Horinger.

CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目) is a data center project in Horinger New Area, Hohhot, China, operated by Shengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data project. It is at the land and permitting stage. The operator has not published an IT load figure. It is planned for 81,730 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as land and permitting on 19 August 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Shengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data project
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot0 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Horinger and Hohhot holds 10 active projects with 298 MW of planned IT load between them, and CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目) has no published figure so it sits outside that ranking. Of those, 3 are operational, 1 is operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 3 are announced only. No third party publishes a colocation vacancy rate for Horinger and Hohhot, and ArusGrid does not estimate one.

CICC Data has 1 other in China tracked by ArusGrid, including CICC Data Ulanqab Low-Carbon Computing Base. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 19 August 2026. The money on record is CN¥4.96bn as of August 2026, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 2 public sources for this project, the latest dated 25 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2026-08-19Land and permitting · sohu.com

Who is behind it

OperatorShengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data project · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-08CN¥4.96bn

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 总投资约220亿元!内蒙古8个算力项目备案获批 (搜狐 (citing the Inner Mongolia online project approval platform), 2026-08-25)
  2. 1361亿元! 2026绿色算力(人工智能)大会千亿项目集中签约 (新华财经, 2026-08-22)

More in Horinger and Hohhot

Also run by CICC Data

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.