Also listed as 火山引擎GW级园区, 火山云谷基地, Volcano Cloud Valley Base and ByteDance Hohhot.
Volcano Engine GW-scale Park, Hohhot is a data center project in Hohhot, China, operated by Volcano Engine (火山引擎, ByteDance). It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as announced on 22 August 2026. Record last checked against its sources on 19 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Horinger and Hohhot holds 10 active projects with 298 MW of planned IT load between them, and Volcano Engine GW-scale Park, Hohhot has no published figure so it sits outside that ranking. Of those, 3 are operational, 1 is operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 3 are announced only. No third party publishes a colocation vacancy rate for Horinger and Hohhot, and ArusGrid does not estimate one.
ByteDance has 3 others in China and 1 project elsewhere in the dataset tracked by ArusGrid, including Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1, Volcano Engine GW-scale Computing Center, Ulanqab and Volcano Engine YRD Computing Centre (火山引擎长三角算力中心). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 22 August 2026.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 22 August 2026, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
This is a ByteDance cloud and AI arm self-build signed in 2026 and described as GW-scale.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Built for Volcano Engine (火山引擎, ByteDance)'s own use. No customer workload has been tied to this building on the public record.
An own-use build. No colocation price applies.