Also listed as 云港智能和林格尔 and Yungang Horinger.
Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目) is a data center project in Horinger New Area, Hohhot, China, operated by Yungang Intelligent Technology (Hohhot) Co. (云港智能科技(内蒙古自治区呼和浩特市)有限公司). It is at the land and permitting stage. It is planned for 88 MW of IT load.
Latest change on record: entered the record as land and permitting on 20 August 2026. Record last checked against its sources on 19 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Horinger and Hohhot holds 10 active projects with 298 MW of planned IT load between them, and Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目) ranks third by planned capacity. Of those, 3 are operational, 1 is operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 3 are announced only. No third party publishes a colocation vacancy rate for Horinger and Hohhot, and ArusGrid does not estimate one.
It is the only Yungang Intelligent project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as at the land and permitting stage on 20 August 2026. The money on record is CN¥1.88bn as of August 2026, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 2 public sources for this project, the latest dated 17 September 2026, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Filed as an intelligent computing industrial park. No GPU tenant is named.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Horinger and Hohhot · All projects in China · All projects at the land and permitting stage · Full directory