ArusGridOperator
Directory › Operators › CICC Data

CICC Data data center projects

China · dataset updated 2026-10-18

ArusGrid tracks 2 active data center projects operated by CICC Data, with 0 MW of planned IT load, across China. Of these, 1 is operational and expanding and 1 is at the land and permitting stage.

ArusGrid classes the operator as colocation. Projects appear under the names China Financial Data Group (中金数据集团) and Shengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data project. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目)Horinger New Area, HohhotLand and permitting81,730 racks *undisclosedShengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data projectNo signal either way
CICC Data Ulanqab Low-Carbon Computing BaseUlanqabExpanding25,000 racks *undisclosedChina Financial Data Group (中金数据集团)No signal either way

Markets where it builds

Firms it has used designers, builders and advisers on record

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.